My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br />PROTECTION OF THE WORK AND PROPERTY <br />1.3 TREE AND PLANT PROTECTION <br />A. Protect existing trees, shrubs and plants on or adjacent to the site that are <br />shown or designated to remain in place against unnecessary cutting, breaking or <br />skinning of trunk, branches, bark or. roots. <br />B. Do not store or park materials or equipment within the drip line of trees that are <br />to remain. <br />C. Install temporary fences or barricades to protect trees and plants in areas <br />subject to traffic. <br />D. Fires shall not be permitted under or adjacent to trees and plants. <br />E. Within the limits of the Work, water trees and plants that are to remain, in order <br />to maintain their health during construction operations. <br />F. ' Cover all exposed roots with burlap and keep it continuously wet. Cover all <br />exposed roots with earth as soon as possible. Protect root systems from <br />mechanical damage and damage by erosion, flooding, run-off or noxious <br />materials in solution. <br />G. If branches or trunks are damaged, prune branches immediately and protect the . <br />cut or damaged areas with emulsified asphalt compounded specifically for <br />horticultural use. <br />H. Remove all damaged trees and plants that die or suffer permanent injury and <br />replace them with a specimen of equal or better quality. <br />I. Coordinate Work-in this Section with requirements of other sections herein. <br />1.4 PROTECTION OF IRRIGATION <br />The CONTRACTOR shall be responsible for maintaining in good condition all <br />irrigation systems within the easements, which could be damaged by <br />construction activities. The CONTRACTOR shall repair any irrigation systems <br />damaged by construction activities within two (2) days. Irrigation systems <br />partially within the right-of-way of 58"' Avenue and all intersecting side streets <br />within project limits may be cut off and capped or connected to same system to <br />maintain functionality. The CONTRACTOR shall be responsible for maintaining <br />the functionality of the remaining portion of the system if it should fall outside of <br />the right-of-way. <br />01541-2 <br />FAPublic Works\ENGINEERING DIVISION PROJECTSM735 IRC Jail Compex Roof Replacement -Repair Projechl-AdminlBid <br />Documents\Master Contract Documents101541 - Protection of Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.