Laserfiche WebLink
PART 3 EXECUTION <br />3.1 FINAL CLEANING <br />A. General: Provide final cleaning. Conduct cleaning and waste -removal operations <br />to comply with local, laws and ordinances and Federal and local environmental and <br />antipollution regulations. <br />B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. <br />Clean each surface or unit to condition expected in an average commercial <br />building cleaning and maintenance program. Comply with manufacturer's written <br />instructions. <br />1. Complete the following cleaning operations before requesting inspection for <br />certification of Substantial Completion for entire Project or for a portion of <br />Project: <br />a. Clean Project site, yard, and grounds, in areas disturbed by <br />construction activities, including landscape development areas, of <br />rubbish, waste material, litter, and other foreign substances. <br />b. Sweep paved areas broom clean. Remove petrochemical spills, stains, <br />and other foreign deposits. <br />C. Rake grounds that. are neither planted nor paved to a smooth, even - <br />textured surface. <br />d. Remove tools, construction equipment, machinery, and surplus <br />material from Project site. <br />e. Clean exposed exterior and interior hard -surfaced finishes to a dirt, free <br />condition, free of stains, films, and similar foreign substances. Avoid <br />disturbing natural weathering. of exterior surfaces. Restore reflective <br />surfaces to their original condition. <br />f. Remove debris and surface dust from limited access spaces, including <br />roofs, plenums, shafts, trenches, equipment vaults, manholes, attics, <br />and similar spaces. <br />g. Sweep concrete floors broom clean in unoccupied spaces. <br />h: Vacuum carpet and similar soft surfaces, removing debris and excess <br />nap; shampoo if visible soil or stains remain. <br />i. Clean transparent materials, including mirrors and glass in doors and <br />windows. Remove glazing compounds and other noticeable, vision - <br />obscuring materials. Replace chipped or broken glass and other <br />damaged transparent materials. Polish mirrors and glass, taking care <br />not to scratch surfaces. <br />j. Remove labels that are not permanent. <br />k. Touch up and otherwise repair and restore marred, exposed finishes <br />and surfaces. Replace finishes and surfaces that cannot be <br />satisfactorily repaired or restored or that already show evidence of <br />repair or restoration. <br />01710 Site Cleanup <br />017704. <br />F.Tublic Works\ENGDIEERING DIVISION PROJECTS\1735 IRC Jad Compex Roof Replacement Repair Froject\1-Admin\Bid <br />DocomentsWaster Contract Documents\01770- Closeout Procedures.doc <br />