Laserfiche WebLink
C. Final Submittal: Submit two set(s) of marked -up Record Prints, one <br />set(s) of Record CAD Drawing files, one set(s) of Record CAD Drawing <br />plots, and three copies printed from record plots. Plot and print each <br />Drawing, whether or not changes and additional information were <br />.recorded. <br />B. Record Product Data: Submit two copy of each. Product Data submittal. <br />1. Where Record Product Data is required as part of operation and <br />maintenance manuals, submit marked -up Product Data as an insert in <br />manual instead of submittal as Record Product Data. <br />PART 2 - PRODUCTS <br />2.1 RECORD DRAWINGS <br />A. Record Prints: Maintain one set of blue- or black -line white prints of the Contract <br />Drawings and Shop Drawings. <br />1. Preparation: Mark Record Prints to show the actual installation where <br />installation varies from that shown originally. Require individual or entity who <br />obtained record data, whether individual or entity is Installer; subcontractor, <br />or similar entity, to prepare the marked -up Record Prints. <br />a. Give particular attention to information on concealed elements that <br />would be difficult to identify or measure and record later. <br />b. Accurately record information in an understandable drawing technique. <br />C. Record data as soon as possible after obtaining it. Record and check <br />the markup before enclosing concealed installations. <br />2. Content: Types of items requiring marking include, but are not limited to, the <br />following: <br />a. Dimensional changes to Drawings. <br />b. Revisions to details shown on Drawings. <br />c. Depths of foundations below first floor. <br />d. Locations and depths of underground utilities. <br />e. Revisions to routing of piping and conduits. <br />f. Revisions to electrical circuitry. <br />g. Actual equipment locations. <br />h. Duct size and routing. <br />i. Locations of concealed internal utilities. <br />j. Changes made by Change Order or Construction Change Directive. <br />k. Changes made following Architect's written orders. <br />I. Details not on the original Contract Drawings. <br />m. Field records for variable and concealed conditions. <br />n. Record. information on the Work that is. shown only schematically. <br />01781 Project Record Documents <br />01781-2 <br />F:\Publtc Woft\ENGINEERING DIVISION PROJECTS\1735 IRC Jail Compex Roof Replacement -Repair Project\1-Ad10-\Bid <br />DocumentsWaster Contract Documems\01781- Project Record Documents.doc <br />