My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Designation "PROJECT RECORD DRAWINGS." <br />d. Name of Architect. <br />e. Name of Contractor. <br />2.2 RECORD PRODUCT DATA <br />A. Preparation: Mark Product Data to indicate the actual product installation where <br />installation varies substantially from that indicated in Product Data submittal. <br />1. Give particular attention to information on concealed products and <br />installations that'cannot be readily identified and recorded later. <br />2. Include significant changes in the product delivered to Project site and <br />changes in manufacturers written instructions for installation. <br />3. Note related Change Ordersand Record Drawings where applicable. <br />2.3 MISCELLANEOUS RECORD SUBMITTALS <br />A. Assemble miscellaneous records required by other Specification Sections for <br />miscellaneous record keeping and submittal in connection with actual performance <br />of the Work. Bind or file miscellaneous records and identify each, ready for <br />continued use and reference. <br />PART 3 - EXECUTION <br />3.1 RECORDING AND MAINTENANCE <br />A. Recording: Maintain one copy of each submittal during the construction period for <br />Project Record Document purposes. Post changes and modifications to Project <br />Record Documents as they occur; do not wait until the end of Project. <br />B. Maintenance of Record Documents and Samples: Store Record Documents and <br />Samples in the field office apart from the Contract Documents used for <br />construction. Do not use Project Record Documents for construction purposes. <br />Maintain Record Documents in good order and in a clean, dry, legible condition, <br />protected. from deterioration and loss. Provide access to Project Record <br />Documents for Architect's reference during normal working hours. <br />END OF SECTION 01781 <br />01781 Project Record Documents <br />017814 - <br />F:\PubHe WorksNENGRaMMG DIVISION PROJECTS\1735 IRC Jail Compex Roof Replacement Repair Projec 1-AdmWBid <br />Dwanents\Mastef Contract Documents\01781- Project Record Documents.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.