My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROOFING REPLACEMENT, RECOVER AND REPAIR PROJECT PAGE 5 <br />INDIAN RIVER COUNTY - JAIL COMPLEX SECTION 035216 <br />JANUARY 4, 2018 LIGHTWEIGHT CONCRETE <br />C. Deposit and screed lightweight insulating concrete in a continuous operation until an <br />entire panel or section of roof area is completed. Do not vibrate or work mix except for <br />screeding or floating. Place to depths and slopes indicated. <br />D. Finish top surface smooth, free 'of ridges and depressions, and maintain surface in <br />condition to receive subsequent roofing system. <br />E. Begin curing operations immediately after placement, and air cure for not less than <br />three days, according to manufacturer's written instructions. <br />F. If ambient temperature falls below 32 deg F (0 deg C), protect lightweight insulating <br />concrete from freezing and maintain temperature recommended by manufacturer for <br />72 hours after placement. <br />3.3 FIELD QUALITY CONTROL <br />A. Testing Agency: Engage a qualified testing /agency to sample materials and perform <br />tests and inspections. <br />B. Testing of samples of lightweight insulating concrete obtained according to <br />ASTM C 172/C 172M, except as modified by ASTM C 495, shall be performed <br />according to the following requirements: <br />1. Determine as -cast unit weight during each hour of placement, according to <br />ASTM C 138/C 138M. <br />2. . Determine oven -dry unit weight and compressive strength according to <br />ASTM C 495. Make a set of at least six molds for each day's placement, but not <br />less than one set of molds for each 5000 sq. ft. (465 sq. m) of roof area. <br />3. Perform additional tests when test results indicate that as -cast unit weight, oven - <br />dry unit weight, compressive strength, or other requirements have not been met. <br />a. Retest cast -in-place lightweight insulating concrete for oven -dry unit weight <br />and compressive strength. <br />C. Prepare test and inspection reports. <br />END OF SECTION 035216 <br />
The URL can be used to link to this page
Your browser does not support the video tag.