My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROOFING REPLACEMENT, RECOVER AND REPAIR PROJECT PAGE 2 <br />INDIAN RIVER COUNTY — JAIL COMPLEX SECTION 075216 <br />JANUARY 4, 2018 . MODIFIED BITUMINOUS MEMBRANE ROOFING <br />C. Installer must comply with current code requirements based on authority having <br />jurisdiction. <br />D. Wind Uplift Performance: Roofing system shall be identical to systems that have been <br />successfully tested by a qualified testing and inspecting agency to resist wind uplift <br />pressure calculated in accordance with ASCE 7-10. <br />E. Florida Product Approval: Roofing membrane, base flashings, and component <br />materials shall comply with requirements in Florida Building Code as part of a roofing <br />system and that is listed in Florida Department of Business & Professional Regulation's <br />Product Approval for noncombustible construction, as applicable: <br />1. Base bifid roofing system shall, at minimum, comply with FBC FL# 2948-R11:. <br />a. Report: J8230.03.08 -R11 <br />b.- System #: LWC-71 <br />2. Preliminary roof membrane for base bid shall, at minimum, comply with FBC FL# <br />2948-R11: <br />a. Report: J8230.03.08 -R11 <br />b. System #: LWC-56 <br />1.5 SUBMITTALS <br />A. Product Data: Manufacturer's data sheets for each product to be provided. <br />B. Detail Drawings: Provide roofing system plans, elevations, sections, details, and <br />details attachment to other Work, including: <br />1. Base flashings, cants, and membrane terminations. <br />2. Tapered insulation, including slopes. <br />3. Crickets, saddles, and tapered edge strips, including slopes. <br />4. Insulation fastening patterns. <br />C. Verification Samples: Provide for each product specified. <br />D. Maintenance Data: Refer to Johns Manville's .latest published documents on <br />www.JM.com. <br />E. Guarantees: Special guarantees specified in this Section. <br />1.6 QUALITY ASSURANCE <br />A. Installer Qualifications: A qualified firm that is, approved, authorized, or licensed by <br />roofing system manufacturer to install manufacturer's product and that is eligible to <br />receive the specified manufacturer's guarantee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.