My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROOFING REPLACEMENT; RECOVER AND REPAIR PROJECT PAGE 1 <br />INDIAN RIVER COUNTY - JAIL COMPLEX SECTION 075620 <br />JANUARY 4, 2018 GUTTER WATERPROOFING <br />PART 1 GENERAL <br />1.01 SUMMARY <br />A. This section specifies all labor, materials, transportation, equipment and services <br />necessary to. install a Sikalastic® RoofPro (Decothane®) waterproofing system, in the <br />existing metal gutter. <br />B. Related Sections <br />1. Section 076200: Flashing and Sheet Metal <br />1.02 REFERENCES <br />A. Factory Mutual (FM Global) - Approval Guide <br />B. American Society for Testing and Materials (ASTM) - Annual Book of ASTM <br />Standards <br />C. -National Roofing Contractors Association (NRCA) <br />D. American Society of Civil Engineers (ASCE) <br />1.03 DEFINITIONS <br />A. Roofing Terminology: Refer to ASTM D1079 and the glossary of the National <br />Roofing Contractors Association (NRCA) Roofing and Waterproofing Manual for <br />definitions of roofing terms related to this section. <br />1.04 PERFORMANCE REQUIREMENTS <br />A. Provide an installed roofing membrane that does not permit the passage of <br />water, and will withstand the design pressures calculated in .accordance with the most <br />current revision of ASCE 7. <br />B. Manufacturer shall provide all primary waterproofing materials that are physically <br />and chemically compatible when installed in accordance with manufacturers current <br />application requirements. <br />1.05 SUBMITTALS <br />A. Provide product data sheets for each type of product indicated in this section. <br />B1 Provide manufacturers standard details and approved shop drawings for the <br />specified system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.