My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROOFING REPLACEMENT, RECOVER AND REPAIR PROJECT PAGE 3 <br />INDIAN RIVER COUNTY - JAIL COMPLEX SECTION 075620 <br />JANUARY 4, 2018 GUTTER WATERPROOFING <br />performance of the work. The installer shall record conference discussions to include <br />decisions and agreements reached (or disagreements), and furnish copies of recorded <br />discussions to each attending party. The main purpose of this meeting is to review <br />foreseeable methods and procedures related to waterproofing work. <br />1.08 REGULATORY REQUIREMENTS <br />A. ` All work shall be performed in a safe, professional manner, conforming to all <br />federal, state and local codes. <br />B. All waterproofing system components shall meet current VOC regulations .as <br />established by the State in which they are being installed; and stating total VOC content, <br />in grams. per litre, for all system components (i.e. primers, adhesives, coatings, etc.) <br />` 1.09 DELIVERY, STORAGE AND HANDLING <br />A. Deliver all waterproofing materials to the site in original containers, with factory <br />seals intact. <br />B. Store all pail goods in their original undamaged containers in a clean, dry location <br />within their specified temperature range. <br />C. Do not expose materials to moisture in any form before, during, or after delivery <br />to the site. Reject delivery of materials that show evidence of contact with moisture. - <br />D. Remove manufacturer supplied plastic covers from materials provided with such. <br />Use "breathable" type covers such as canvas tarpaulins to allow venting and protection <br />from weather and moisture. Cover and protect materials at the end of each work day. Do <br />not remove any protective tarpaulins until immediately before the material will be <br />installed. <br />E. . Materials shall be stored above 55°F (12.6°C) a minimum of 24 hours prior to <br />application. <br />1.10 PROJECT CONDITIONS <br />A. Weather <br />1. Proceed with waterproofing only when existing and forecasted weather <br />conditions permit. <br />2. Membrane application can proceed when precipitation is imminent. Sikalastic <br />RoofPro (Decothane) is capable of curing, in immersion, immediately after application. <br />Physical damage, in the form of pock marks, may occur if uncured Sikalastic RoofPro <br />(Decothane) is exposed to heavy rainfall, but is not considered a limiting factor in the <br />performance of the roofing membrane. <br />.3. Ambient temperatures should be above 32°F (0°C) when applying the system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.