Laserfiche WebLink
ROOFING REPLACEMENT, RECOVER AND REPAIR PROJECT <br />INDIAN RIVER COUNTY - JAIL COMPLEX <br />JANUARY 4, 2018 <br />PAGE 6 <br />SECTION 075620 <br />GUTTER WATERPROOFING <br />ELONGATION <br />D412 <br />MIN 200% <br />ACCELERATED WEATHERING <br />G154 <br />NO CRACKING OR <br />FL/UV — 5000 HOURS <br />CHECKING <br />WATER VAPOR TRANSMISSION <br />E96 <br />MAXIMUM 8.5 gms/m2/ day <br />PERMEABILITY / PERMEANCE <br />0.033 erm-inches <br />FLEXIBILITY — <br />D522 <br />PASS <br />MANDREL BEND <br />NO. CRACKING OR FLAKING <br />TEAR RESISTANCE <br />D624 <br />MINIMUM 5.8 kN/m 33 Ibf/in <br />INDENTATION HARDNESS <br />D2240 <br />82 Durometer Units (+/- 5 <br />units <br />DYNAMIC PUNCTURE <br />D5635 <br />MINIMUM 15 joules (357 <br />RESISTANCE <br />ft. oundaIs <br />STATIC PUNCTURE <br />D5602 <br />MINIMUM 20.7 kg. (45.5 lbs.) <br />RESISTANCE <br />2.04 FLASHING MATERIALS <br />A. The fluid -applied membrane system is seamless and self -flashing. No special <br />flashings are required for system installation. <br />PART 3 EXECUTION <br />3.01 � INSPECTION <br />A. Verify that the surfaces and site conditions are. ready to receive work. <br />B. Verify.that the deck is supported and secured <br />C. Verify that the deck is clean. and smooth, free of depressions, waves, or <br />projections, and properly sloped to drains, valleys, eaves, scuppers or gutters. <br />D. Verify that the deck surfaces are dry and free of ice or snow. <br />E. Verify that all roof openings or penetrations through the roof are solidly set. <br />3.02 SUBSTRATE PREPARATION <br />A. Throughly clean all gutter surfaces. <br />3.03. INSTALLATION - GENERAL <br />A. Install Sikalastic .RoofPro (Decothane) waterproofing system according to all <br />current application requirements in addition to those listed in this section. <br />3.04 FLUID APPLIED MEMBRANE APPLICATION <br />