My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROOFING REPLACEMENT, RECOVER AND REPAIR PROJECT PAGE 7 <br />INDIAN RIVER COUNTY — JAIL COMPLEX SECTION 076200 <br />JANUARY 4, 2018 SHEET METAL FLASHING AND TRIM <br />2.6 FINISHES <br />A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for <br />recommendations for applying and designating finishes. <br />B. Protect mechanical and painted finishes on exposed surfaces from damage by applying <br />a strippable, temporary protective covering before shipping. <br />C. Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces <br />are acceptable if they are within one-half of the range of approved Samples. <br />Noticeable variations in the same piece are not acceptable. Variations in appearance <br />of other components are acceptable if they are within the range, of approved Samples <br />and are assembled or installed to minimize contrast. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine substrates, areas, and conditions, with Installer present, to verify actual <br />locations, dimensions and other conditions affecting performance of work.. <br />1. Verify that substrate is sound, <br />securely anchored. <br />2. Proceed with installation only <br />corrected. <br />3.2 INSTALLATION, GENERAL <br />dry, smooth, clean, ,sloped for drainage, and <br />after unsatisfactory conditions have been <br />A. General: Anchor sheet metal flashing and trim and other components of the Work <br />securely in place, with provisions for thermal and structural movement. Use fasteners, <br />solder, welding rods, protective coatings, separators, sealants, and other <br />miscellaneous items as required to complete sheet metal flashing and trim system. <br />1. Torch cutting of sheet metal flashing and trim is not permitted. <br />B. Metal Protection: Where dissimilar metals will contact each other or corrosive <br />substrates, .protect against galvanic action by painting contact surfaces with bituminous <br />coating or by other permanent separation as recommended by fabricator or <br />manufacturers of dissimilar metals. <br />1. Coat side of sheet metal flashing and trim with bituminous coating where flashing <br />and trim will contact wood, ferrous metal, or cementitious construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.