My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROOFING REPLACEMENT, RECOVER AND REPAIR PROJECT PAGE 1 <br />INDIAN RIVER COUNTY - JAIL COMPLEX SECTION 077100 <br />JANUARY 4, 2018 ROOF SPECIALTIES - METAL COPINGS <br />SECTION 0771007 ROOF SPECIALTIES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions, of the Contract, including General and, <br />Supplementary Conditions and Division 01 Specification Sections, apply to this <br />Section. <br />1.2 SUMMARY <br />A. Section Includes: <br />1. Copings. <br />B. Related Requirements: <br />1. Section 061000 "Rough Carpentry" for wood nailers, curbs, and blocking. <br />2. Section 076200 "Sheet Metal Flashing and Trim" for custom- and site -fabricated <br />sheet metal flashing and trim._ <br />3. Section 079200 "Joint Sealants" for field -applied sealants between roof <br />specialties and adjacent materials. <br />C. Preinstallation Conference: Conduct conference at Project site. <br />1. Meet with Owner,. Architect, Owner's insurer if applicable, roofing -system testing <br />and inspecting agency representative, roofing Installer, roofing -system <br />manufacturer's representative, Installer, structural -support Installer, and installers <br />whose work interfaces with or affects roof specialties, including installers of <br />roofing materials and accessories. <br />2. Examine substrate conditions for compliance with requirements, including <br />flatness and attachment to structural members. <br />3. Review special roof details, roof drainage, and condition of other construction <br />that will affect roof specialties. <br />1.3 ACTION SUBMITTALS <br />A. Product Data: For each type of product. <br />1. Include construction details, material descriptions, dimensions of individual <br />components and profiles, and finishes. <br />B. Shop Drawings: For roof specialties. <br />1. Include plans, elevations, expansion joint locations, keyed details, and <br />attachments to other work. Distinguish between plant- and field -assembled work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.