My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROOFING REPLACEMENT, RECOVER AND REPAIR PROJECT PAGE 3 <br />INDIAN RIVER COUNTY — JAIL COMPLEX SECTION 077100 <br />JANUARY 4, 2018 _ ROOF SPECIALTIES — METAL COPINGS <br />1. Build mockup of typical roof edge as shown on Drawings. <br />2. Build mockup of typical roof edge as part of Integrated Exterior Mockup. <br />3. Build mockup of typical roof edge, typical coping, expansion joint, <br />counterflashings and including fascia gutter and downspout, approximately 10 <br />feet (3.0 m) long, including supporting construction, seams, <br />attachments, underlayment, and accessories. <br />4. Approval of mockups does not constitute approval of deviations from the <br />Contract Documents contained in mockups unless Architect specifically approves <br />such deviations in writing. <br />5. Subject to compliance with requirements, approved mockups may become part <br />of the completed Work if undisturbed. at time of Substantial Completion. <br />1.7 DELIVERY, STORAGE, AND HANDLING <br />A. Do not store roof specialties in contact with other materials that might cause staining, <br />denting, or other surface damage. Store 'roof specialties away from uncured concrete <br />and masonry. <br />B. Protect strippable protective covering on roof specialties from exposure to sunlight and <br />high humidity, except to extent necessary for the period of roof -specialty installation. <br />1.8 FIELD CONDITIONS <br />A. Field Measurements: Verify profiles and tolerances of roof -specialty substrates by field <br />measurements before fabrication, and indicate measurements on Shop Drawings. <br />B. Coordination: Coordinate roof specialties with flashing, trim, and construction of <br />parapets, roof deck, roof and wall panels, and other. adjoining work to provide a <br />leakproof, secure, and noncorrosive installation. <br />1.9 WARRANTY <br />A. Roofing -System Warranty: Roof specialties are included in warranty provisions in roof <br />membrane material warranty. <br />B. Special Warranty on Painted Finishes: Manufacturer agrees to repair finish or replace <br />roof specialties that show evidence of deterioration of factory -applied finishes within <br />specified warranty period. <br />1. Fluoropolymer Finish: Deterioration includes, but is not limited to, the following: <br />a. Color fading more than 5 Hunter units when tested according to <br />ASTM D 2244. <br />b. Chalking in excess of a No.8 rating when tested according to <br />ASTM D 4214. <br />C. Cracking, checking, peeling, or failure of paint to adhere to bare metal. <br />2. Finish Warranty Period: 20 years from date of Substantial Completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.