Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and Atlantic Roofing II of Vero Beach, Inc. <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />PROJECT DESCRIPTION: THE PROJECT INCLUDES THE REPLACEMENT, RECOVER <br />AND REPAIR OF DESIGNATED ROOFING ASSEMBLIES AT THE INDIAN RIVER COUNTY <br />JAIL COMPLEX TO PROVIDE A COMPLETE, WATERTIGHT, 20 -YEAR WARRANTABLE <br />ROOF SYSTEM. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: IRC JAIL COMPLEX ROOFING REPLACEMENT, RECOVER <br />AND REPAIR PROJECT <br />County Project Number: IRC -1735 <br />Bid Number: 2018021 <br />Project Address: 4055 41ST AVE., Vero Beach, Florida 32960 <br />ARTICLE 3 = ENGINEER <br />3.01 Jay Ammon Architect, Inc. is hereinafter called the ENGINEER and will act as OWNER's <br />representative, assume. all duties and responsibilities, and have the rights and authority <br />assigned to ENGINEER in the Contract Documents in connection with the completion of <br />the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 120 calendar day after the <br />date when the Contract Times commence to run as provided in paragraph 2.03 of the <br />00520 - Agreement (Public Works) REV 06-14.doc <br />00520-2 <br />F:\Purchasing\Bids\2017-2018 FY (2018000)\2018021 Jail Roof Replacement\00520 - Agreement (Public Works) REV 06-14.doc <br />