My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00550 - Notice to Proceed <br />krel <br />(BIDDER) <br />ADDRESS: <br />Contract For: <br />Dated <br />IRC JAIL COMPLEX ROOFING REPLACEMENT, RECOVER & REPAIR PROJECT <br />Project No: IRC4735 <br />IRC Bid No. 2018021 <br />You are notified that the Contract Times under the above contract will commence to run on <br />By that date, you are to start performing your obligations under the Contract <br />Documents. The contract has allocated 120 calendar days for Substantial Completion of this <br />project and 150 calendar days for Final Completion. In accordance with Article 4 of the <br />Agreement the date of Substantial Completion is and the date of readiness for final <br />payment is <br />CONTRACTOR shall not commence work under this Contract until he has obtained all <br />insurance required under Article 5 and such insurance has been delivered to the OWNER and <br />approved by the OWNER, nor shall the CONTRACTOR allow any Subcontractor to commence <br />work on his subcontract until all similar insurance required of the Subcontractor has been so <br />obtained and approved. All such insurance shall remain in effect until final payment and at all <br />times thereafter when CONTRACTOR may be correcting, removing or replacing defective Work <br />in, accordance with Article 13. <br />Also, before you may start any Work at the Site, you must: <br />(add other requirements, if applicable) <br />INDIAN RIVER COUNTY <br />(OWNER) <br />By: <br />(AUTHORIZED SIGNATURE) <br />. (TITLE) <br />00550 - Noticeto Proceed REV 14-11 <br />00550-1 <br />R%Pubk WorksIENGINEERING DMSION PROJECTS11735IRC daft Cwrgm Roof Replacement -Repair Pr*d%1-A&dnl0id Do---ts%Uder Contrail Doaane t%00550 - <br />Notioe to Proceed REV 14-11.doc Rev. 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.