Laserfiche WebLink
SECTION 00800 - SUPPLEMENTARY CONDITIONS <br />TO THE GENERAL CONDITIONS <br />Article Title <br />Introduction <br />Defined Terms <br />Terminology <br />Before Starting Construction <br />Preconstruction Conference <br />Coordination of Plans, Specifications, and Special Provisions <br />Subsurface and Physical Conditions <br />Performance, Payment and Other Bonds <br />Certificates of Insurance <br />CONTRACTOR'S Liability Insurance <br />OWNER's Liability Insurance <br />Property Insurance <br />Waiver of Rights <br />Receipt and Application of Insurance Proceeds <br />Acceptance of Bonds and Insurance; Option to Replace <br />Labor; Working Hours <br />Concerning Subcontractors, Suppliers and Others <br />Permits <br />Cost of the Work <br />Test and Inspections <br />OWNER May Stop the Work <br />Correction Period <br />Progress Payments <br />Substantial Completion <br />Article Number <br />Sc —1.00 <br />Sc —1.01 <br />SC —1.02 <br />SC — 2.05 <br />SC — 2.06 <br />SC 3.06 <br />SC — 4.02 <br />SC — 5.01 <br />SC — 5.03 <br />SC — 5.04 <br />SC — 5.05 <br />SC — 5.06 <br />SC — 5.07 <br />SC — 5.08 <br />SC — 5.09 <br />SC — 6.02 <br />SC — 6.06 <br />SC — 6.08 <br />Sc —11.01 <br />SC —13.03 <br />SC —13.05 <br />SC —13.07 <br />SC —14.02 <br />SC —14.04 <br />00800-i <br />00800 - Supplementary Conditions 05-13 rev <br />00800 iF:\Public Works\ENGINEERING DNISION PROJECTS\1324 58th Ave Resurfacing (N. of 26th St to N. of 57th St)\1-Admin\Bid documents\Master Contract <br />Documents\00800 - Supplementary Conditions 05-13 rev.doc <br />