Laserfiche WebLink
SC -5.08 Receipt and Application of Insurance Proceeds <br />SC -5.08 Delete GC -5.08 (paragraphs A and B) in its entirety. <br />SC -5.09 Acceptance of Bonds and Insurance; Option to Replace <br />SC -5.09 Delete GC-5.09(paragraph A)in its entirety. <br />SC -6.02 Labor; Working Hours <br />SC -6.02.6. Add the following paragraphs immediately after paragraph GC -6.02.8: <br />1. Regular working hours are defined as Monday through Friday, excluding Indian <br />River County Holidays, from 7 a.m. to 5 p.m. Lane closures are limited to the <br />hours of 9:00 a.m. to 4:00 p.m., unless otherwise authorized by the OWNER in <br />writing. <br />2. Indian River County Holidays are: New Year's Day, Martin Luther King, Jr. Day, <br />Good Friday, Memorial Day, Independence Day, Labor Day, Veterans Day, <br />Thanksgiving Day, Friday after Thanksgiving, Christmas Eve and Christmas Day. <br />Working on these days will not be permitted without prior written permission and <br />approval from the Construction. Coordination Manager. <br />3. The CONTRACTOR shall receive no additional compensation for overtime work, <br />i.e., work in excess of eight hours in any one calendar day or 40 hours in any one <br />calendar week, even though such overtime work may be required under <br />emergency conditions and may be ordered by the ENGINEER in writing. <br />4. All costs of inspection and testing performed during overtime work by the <br />CONTRACTOR, which is allowed solely for the convenience of the <br />CONTRACTOR, shall be borne by the CONTRACTOR, and a credit given to the <br />OWNER to deduct the costs of all such inspection and testing from any <br />payments otherwise due the CONTRACTOR. <br />5. All costs of OWNER's employees and costs of ENGINEER's Consultant resulting <br />from overtime work by the CONTRACTOR, which is allowed solely for the <br />convenience of the CONTRACTOR, shall be borne by the CONTRACTOR, and a <br />credit given to OWNER to deduct all such costs from any payments otherwise <br />due the CONTRACTOR. <br />6. No work shall commence before 7 a.m. or continue after 5 p.m. except in case of <br />emergency upon specific permission of the ENGINEER. <br />SC -6.06 Concerning Subcontractors, Suppliers, and Others <br />SC -6.06.C. Add the following sentence at the end of paragraph GC-6.06.C:OWNER or <br />ENGINEER may furnish to any such Subcontractor, Supplier, or other individual or entity, to the <br />extent practicable, information about amounts paid to CONTRACTOR on account of Work <br />performed for CONTRACTOR by a particular Subcontractor, Supplier, or other individual or entity. <br />SC -6.08 Permits <br />SC -6.08 Add the following paragraphs immediately after paragraph GC -6.08.A: <br />1. The OWNER has obtained the following permits (copies of these permits are <br />contained in Appendix "A:'): <br />A. Indian River Farms Water Control District Permit No.'s 17-14 8r 17-15 <br />00800-6 <br />00800 - Supplementary Conditions 05-13 rev <br />00800 6FAPub1ic Works\ENGINEERING DIVISION PROJECTS\1324 58th Ave Resurfacing IN. of 26th St to N. of 57th St)\1-Admin\Bid documents\Master Contract <br />Documents\00800 - Supplementary Conditions 05-13 rev.doc <br />