My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-065A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-065A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:19:23 AM
Creation date
4/25/2018 4:53:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-065A
Agenda Item Number
12.F.2.
Entity Name
58th Avenue Resurfacing
Subject
contract documents and specifications for resurfacing
Area
North of 26th St. to South of 49th St.
Project Number
IRC-1328
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. <br />DATE OF ISSUANCE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project: 58T"AVENUE RESURFACING/I <br />OWNER's Project No. IRC -1324 <br />EFFECTIVE DATE: <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />[( Unit Prices <br />❑ Lump Sum <br />II Other: <br />II By Change Order: <br />Method of determining change in <br />Contract Times <br />II Contractor's Records <br />II Engineer's Records <br />❑ Other: <br />❑ By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$ Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated If the change involves an, increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: <br />RECOMMENDED: <br />APPROVED: <br />By: <br />By: <br />By: <br />CONTRACTOR (Signature) <br />ENGINEER (Signature) <br />OWNER (Signature) <br />Date: <br />Date: <br />Date: <br />* * END OF SECTION * * <br />00948 - Work Change Directive <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1324 58th Ave Resurfacing (N. of 26th St to N. of 57th St)\1-Admin\Bid <br />documents\Master Contract Documents\00948 - Work Change Directive Rev 06-2013.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.