Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and Timothy Rose Contracting Inc <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The proposed improvements to 581 Avenue from north of 261 Street to south of 491 <br />Street consist of reconstructing the roadway utilizing full depth reclamation, milling and <br />resurfacing, widening the existing shoulders to 5 -feet, structural asphalt, surface <br />asphalt, minor drainage improvements, utility adjustments, signing, and pavement <br />markings. This project is an F.D.O.T. Small County Outreach Program (SCOP) funded <br />project, FM No. 434840-1-54-01. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: 58T"AVENUE RESURFACING/RECLAMATION NORTH OF 26TH <br />STREET TO SOUTH OF 49TH STREET <br />County Project Number: IRC -1324 <br />Bid Number: 2018005 <br />Project Address: 58t' Avenue (North of 26t'' Street to South of 49t' Street) <br />Vero Beach, Florida 32967 <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />00520 - Agreement (Public Works) REV 06-14.doc <br />00520-2 <br />F:\Purchasing\Bids\2017-2018 FY (2018000)\2018005 58th Ave Resurfacing (26th St to 496 St)\00520 - Agreement (Public Works) REV 06-14.doc <br />