My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-065A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-065A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:19:23 AM
Creation date
4/25/2018 4:53:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-065A
Agenda Item Number
12.F.2.
Entity Name
58th Avenue Resurfacing
Subject
contract documents and specifications for resurfacing
Area
North of 26th St. to South of 49th St.
Project Number
IRC-1328
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: 20 <br />OWNER: Indian River County <br />CONTRACTOR <br />CONTRACT FOR: 58TH AVENUE RESURFACING/RECLAMATION FROM NORTH OF 26TH <br />STREET TO SOUTH OF 49TH STREET <br />Project No. IRC -1324 <br />Project Description: The proposed improvements to 581 Avenue from north of 2e Street <br />to south of 491' Street consist of reconstructing the roadway utilizing full depth <br />reclamation, milling and resurfacing, widening the existing shoulders to 5 -feet, structural <br />asphalt, surface asphalt, minor drainage improvements, utility adjustments, signing, and <br />pavement markings. This project is an F.D.O. T. Small County Outreach Program (SCOP) <br />funded project, FM No. 434840-1-54-01. <br />OWNER's Bid No. 2018005 <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To - <br />OWNER <br />And To - <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within 30 calendar <br />days of the above date of Substantial Completion. <br />00630 - Certificate of Substantial Completion REV 04-07 <br />00630-1 <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1324 58th Ave Resurfacing (N. of 26th Sl to N. of 57th St)\1-Admin\Bid documents\Master Contract Documents\00630 - <br />Certificate of Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.