My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/06/2018
CBCC
>
Meetings
>
2010's
>
2018
>
03/06/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:51:18 PM
Creation date
5/1/2018 1:58:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/06/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
526
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2018 -0085 -PAA -EQ <br />DOCKET NO. 20170226 -EQ <br />PAGE 31 <br />(Continued from SheetNo. 10.303) <br />Eighth Revised Sheet No. 10.304 <br />"mceis aevemn imevrsea sneer ro. iv..)v4 <br />For any Dispatch Hour the firm energy rate shall be. on an hour -by -hour basis, the Company s Avoided Unit Energy <br />Cost. For any other period during which energy is delivered by the QS to FPL, the firm energy rate in cents per <br />kilowatt hour (¢/KkVh) shall be the following on an hour -by -hour basis: the lesser of (a) the as -available energy rate <br />calculated by FPI, in accordance with FPSC Rule 25-17.0825, FAC, and FPL's Rate Schedule COG -1, as they may <br />each be amended from time to time and (b) the Company's Avoided Unit Energy Cast The Company's Avoided <br />Unit Energy Cost, in cents per kilowatt-hour (¢ll:AFh) shall be defined as the product of: (a) the fuel price in <br />S/mmBTU as determined from gas prices published in Platts Inside FERC Gas Market Report, first of the month <br />posting for Florida Gas Transmission Zone 3, plus all charges, surcharges and percentages that are in effect from <br />time to time for service under Gulfstream Natural Gas System's Irate Schedule FTS. and (b) the average annual <br />heat rate of the Avoided Unit, plus (c) an additional payment for variable operation and maintenance expenses <br />which will be escalated based on the actual Producer Price Index All energy purchases shall be adjusted for losses <br />from the point of metering to the Delivery Point. The calculation of the Company's avoided energy cost reflects the <br />delivery of energy from the geographical area of the Company in which the Delivery Point of the QS is located. <br />Option D- Fixed Finn Enerev Pavmcnts Startine as carp as the In-Smice Date of the OS Facilitv <br />The calculation of payments to the QS for energy delivered to FPI, may include an adjustment at the election of the <br />QS in order to implement the provisions or Rule 25-17.250 (6) (b), F.A.C. Subsequent to the determination of full <br />avoided cost and subject to the provisions of Rude 25-17.0832(3) (a) through (d), F.A.C.. a portion of the base <br />energy costs associated with the avoided unit, mutually agreed upon by the utility and renewable energy generator, <br />shall be fined and amortized one present value basis over the term of the contract starting, at the election of the QS, <br />as early as the in-service date of the QS. `Base energy costs associated with the avoided unit" means the energy <br />costs of the avoided unit to the extent the unit would have operated. The portion of the base energy costs mutually <br />agreed to by the Company and the QS shall be specified in Appendix E. The Company will provide the QS with a <br />schedule of "Fixed Energy Payments" over the tern of the Standard Offer Contract based on the applicable <br />information specified in Appendix E. <br />ESTIMATED AS -AVAILABLE FWERGY COST <br />As required in Section 25-17.0832, F.A.C. as -available energy cost projections until the in-service date of the avoided unit will <br />be provided within 30 days of receipt by FPL ore written request for such projections by any interested person. <br />ESTIMATED UNIT FUEL COS'1 <br />As required in Section 25-17.0832, F.A.C. the estimated unit fuel costs associated with the Company's Avoided Unit and based <br />on current estimates of the price of natural gas will be provided within 30 days ore written request for such an estimate. <br />(Continued on Sheet No. 10.305) <br />Issued by: S. E. Romig, Director, Rates and Tariffs <br />FJTective. September 13, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.