Laserfiche WebLink
ORDER NO. PSC -2018 -0085 -PAA -EQ <br />DOCKET NO. 20170226 -EQ <br />PAGE 41 <br />Second Revised Sheet No. 10.313 <br />FLORIDA POWER & LIGHT COMPANY Cancels Fi" Revised Sheet No. 10.313 <br />TO TI'IE STANDARD OFFER CONTRACT <br />FOR THF: PURCIIASE OF FIRM C APACr1Y AND ENERGY <br />FROM RENEWABLE ENERGY FACILITIES <br />OR QUALIFYING FACILITIES WITH A DESIGN CAPACITY OF 100 KW OR LESS <br />PAY FOR PERFORMANCE PROVISIONS MONTHLY CAPACITY PAYMENT CALCULATION <br />L Monthly Capacity Payments (MCP) for each Monthly Billing Period shall be computed according to the following: <br />A. In the event that the Annual Capacity Billing Factar ("ACBI" ), as defined below, is less than 80% then no Monthly Capacity Payment shalt be <br />due. llwt is: <br />MCP=0 <br />B. In the event that die ACBE is equal to or greater than 80% but less than 94%, then die Monthly Capacity Payment slwll be calculated by using <br />die following formula <br />MCP =BCP x 1144x(ACBF-94%)j xCC <br />C. In the cimnt that the ACBF is equal to or greater than 94%, then the Monthly Capacity Payment shall be calculated by using, the fb9owing <br />formula: <br />MCP = BCP x CC <br />Where: <br />MCP - <br />Monthly Capacity Payment in dollars. <br />RCP = <br />Base Capacity Payment in $ KW/Month as speci tied in FPi.'s Rate Schedule QS -2. <br />CC = <br />Committed Capacity in KW. <br />ACBE - <br />Annual Capacity Baling Factor. 11us Factor is calculated using the 12 months rolling average of Ore Monthly Capacity <br />Factor. This 12 month rolling avanuge slmll be defined as tie sum of the 12 consecutive Monthly Capacity Factors <br />preceding the date of calculation, divided by U. During the first 12 consecutive Monthly Billing Periods, oommeraing <br />with the first Monthly Billing Period in which C.aliaity pnymienls nre to he made, the calculation of the Annual <br />Capacity Baling Factor shall be perforated as follows: (a) during the first Monthly Billing Period, the Annual Capacity <br />Billing Factor shall be equal to the Monthly Capacity Factor, (b) thcividler, the calculation of the Annual Capacity <br />Billing Factor slcdl be compiiW by dividing tie stun of the Monthly Capacity Factors dming the first yen's Monthly <br />Billing Periods in which Capacity payments we to In made by the number of Monthly Bilin Periods wlhidh have <br />elapsed This calculation shall be performed at the end of each Monthly Bal ng Period until enough Monthly Dining <br />Periods, have elapsed to calculate a tare 12 -month rolling average Annual Capacity Billing Factor. Periods during <br />which the Facility has temporarily set its Comnrilted Capacity equal to 0 KW due to a Force Majeure evert pursuant to <br />Section 16 shall be excluded from the applicable capacity factor calculation. <br />MCF = <br />Monthly Capacity Factor. The sun of (i) the Hourly Factors of the Non -Dispatch Homs plica (ti) the Hourly <br />Factors of the Dispatch Homs or the Hourly factors of the hours when FPL requested reduced deliveries pursamnt to <br />Sections 8.4.6 and 8.4.8 (Reduced Delivery Hours divided by the number o£hours in the Monthly Billing Period. <br />IWNDII m <br />Hourly Factor of a Non -Dispatch [lour. The energy received during the hour divided by the Committed Capacity. <br />For purposes of calculating the Hourly Factor of a Non-Dispalch Hour the energy received shall not exceed the <br />Committed C-apacily. <br />HFDH = Hourly Factor of a Dispatch Hour or a Reduced Ddi%vW Hour. The scheduled energy received divided by the <br />scheduled energy requested. For purposes of calculating the Hourly Factor of a Dispatch Hour or the Houdy Factor <br />of a Reduced Delivery Hour the scheduled cneW received shall not exceed the scheduled anergy requested. <br />On -Peak []ours - 'Those hours occurring April I through October 31 Mondays through Fridays, from 12 noon to 9:00 p.m. excluding <br />Menhorial Day, Indcperadence Day and Labor Day; and November I through March 31 Mondays through Fridays <br />from 6:00 a.m. to 10:00 a.m. and 6:00 p.m. to 10:00 pan. prevailing Gaster time excluding Thaul4ving Day. <br />Chrish reis Day and New f'ear's Day. Fill, shun have One right to change such On- Peak Homs by providing the QS <br />a minimum of thirty calendar dayF advance notice. <br />Monthly Billing = The period beginning an the first calendar day of each calendar month, except that the initial Monthly Billing <br />Period Period shall consist of Ore period beginning 12:01 a.m. on the Capacity Delivery Period Date and ending with <br />the last calendar day of such month. <br />Scheduled Energy and Dispatch Hours are as defined in Section 8.4.7 of the Standard otFer Contact. <br />Issued by: S. E. Romig, Director, Rates and Tariffs <br />Effective: Augusl27,2015 <br />9 • L-1 <br />