Laserfiche WebLink
ORDER NO. PSC -2018 -0105 -PCO -EI <br />DOCKET NO. 20180001 -EI <br />PAGE 9 <br />ATTACHMENT B <br />Table 1 <br />FPL Revised Capacity Cost Recovery Factors <br />for the Period March -December, 2018 <br />Rate Schedule <br />$/kW <br />$/kWh <br />Reservation <br />Demand <br />Charge <br />(RDC) <br />$/kWtt <br />Sum of <br />Daily <br />Demand <br />Charge <br />(SDD) <br />$/kWtz <br />RS 1 /RTR 1 <br />- <br />0.00257 <br />- <br />- <br />GS1/GST1 <br />- <br />0.00241 <br />- <br />- <br />GSD1/GSDTI/HLFTI <br />0.77 <br />- <br />- <br />- <br />OS2 <br />- <br />0.00108 <br />- <br />- <br />GSLD1/GSLDTI/CSI/CST1/HLFT2 <br />0.91 <br />- <br />- <br />- <br />GSLD2/GSLDT2/CS2/CST2/HLFT3 <br />0.85 <br />- <br />- <br />- <br />GSLD3/GSLDT3/CS3/CST3 <br />0.87 <br />- <br />- <br />- <br />SST1T <br />- <br />- <br />$0.11 <br />$0.05 <br />SST1D1/SST1D2/SST1D3 <br />- <br />- <br />$0.12 <br />$0.06 <br />CILC D/CILC G <br />0.97 <br />- <br />- <br />- <br />CILC T <br />0.94 <br />- <br />- <br />- <br />MET <br />0.96 <br />- <br />- <br />- <br />OLl/SLI/SLIM/PLI <br />- <br />0.00020 <br />- <br />- <br />SL2/SL2M/GSCU1 <br />- <br />0.00168 <br />- <br />- <br />Source: Schedule E12 -E, (Appendix 2, Page 5 of 10 <br />11RDC=((Total Capacity Costs )/(Projected Avg 12CP @gen)(.10)(dema;id loss expansion factor)/12 months <br />12SDD=((Total Capacity Costs )/(Projected Avg 12CP @gen)(21 on peak days)(demand loss expn. factor)/12 <br />months <br />911 C 9 <br />