My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/06/2018
CBCC
>
Meetings
>
2010's
>
2018
>
03/06/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:51:18 PM
Creation date
5/1/2018 1:58:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/06/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
526
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2018 -0085 -PAA -EQ <br />DOCKET NO. 20170226 -EQ <br />PAGE 13 <br />Second Revised Sheet No. 9.035 <br />FLORIDA POWER & iJGHT COAVANY Cancels First Sheet No. 9.035 <br />(Continued from Shat No. 9.034) <br />8. Flectriclty Production and Plant Maintenance Schedule <br />8.1 During the term of thus Contract, no later than sixty (60) days prior to the Capacity Delivery Date and prior to April 1 of each <br />calendar year thereafter, the QS shall submit to FPL in whiting a detailed plan oC (a) the amount of firm capacity and energy to be generated <br />by the Facility and delivered to the Delivery Point for each month of the following calendar year, and (b) the time, duration and tmagnitudc of <br />any scheduled maintenance perio(Ys) and any anticipated reductions in capacity. <br />8.2 By October 31 of each calendar year, FPL shall notify the QS in writing wbother the requested scheduled maintenance periods <br />in tic detailed plan urc acceptable. If FPL objects to any critic requested scheduled maintenance lxricxls, FPL shall advise the QS of due time <br />period closest to the requested lxriod(s) when the ohdage(s) can be scheduled. The QS shall schedule maintenance outages, only during <br />periods approved by FPL, such approval not unreasonably withheld. Once the schedule for maintenance has leen established and approved <br />by FPi„ either Party may request a subscgncnt change in such schedule and, except when such event is due to Force Majeure, request <br />approval for such change from the other Party, such approval not to be unreasonably %iddteld or delayed. Scheduled maintenance outage <br />days shall tic linotcd to seven (7) days per calendar year unless the manufacturer's recommendation of maintenance outage days for the <br />technology and equipment used by the Facility exceeds such 7 day period, provided!, such number of days is considerad reasonable by <br />prudent industry standards and does not exceed two (2) fourteen (14) day intervals, one in the Spring and one in the Fall, in any calendar <br />year. The scheduled maintenance outage days applicable for the QS are _ days in the Spring and _ days in the Pall of each calendar <br />year, provided the conditions specified in the previous sentence are satisfied. In no event shall maintenance periods be scheduled during the <br />following periods: Jane 1 through and including October 31st and December 1 through and including February 28 (or 29'a as the case may <br />be). <br />8.3 Tlie QS shall comply with reasonable requests by FPL regarding day-to-day and hour -by -hour conhmunieation between the <br />Parties relative to electricity production and maintenance scheduling. <br />8.4 Dispatch mud Control <br />8.4.1 The power supplied by the QS hereunder shall be in the form of three-phase 60 1fertz alternating current, at a nominal <br />operating voltage of 000 volts ( kV) and power factor dispatchable and controllable in One range of 85% lagging to <br />85% leading as measured at the Delivery Point to maintain system operating parameters, as specified by FPL. <br />8.4.2 At all times during the term of Ibis Contract, the QS shall operate and maintain the Facility: (a) in such a runner as to ensure <br />compliance with its obligations hereunder, in accordance with prudent engineering and operating practices and applicable law, and (b) with <br />all system protective equipment in service whenever the Facility is connected to, of is operated in parallel with, FPL's system. The QS shall <br />install at the Facility those system protection and control devices necessary to ensure safe and protected operation of all cnergi72d equipment <br />during normal testing and repair. The QS shall have qualified personnel test mel calibrate all protective equipment at regular intervals in <br />accordance with good engineering and operating practices. A unit functional trip test shall he performed after each overhaul of the Facility's <br />turbine, generator or boilers and the results shall be provided to FPL prior to returning the Facility to service. The specifics of the unit <br />functional tional trip lest will be cpmistdad with gadxl engineering and operatin . practices. <br />8.4.3 If the Facility is separated from the FPL system for any reason, under no circumstances simll the QS reconnect the Facility <br />into FPI: s system without first obtaining FPL'.- prior written approval. <br />8.4.4 During the term of this Contract, the QS shall employ qualified personnel for mama; inp, operating arid maintaining the <br />Facility and far coordinating such with FPL. If the Facility has a Committed Capacity greater than 10 MN then, the QS shall ensure that <br />operating personnel arc on duty at all times, lwcrdy-four (24) !lours a calendar day and seven (7) calendar days a wcck. I f tic Facility has a <br />Committed Capacity equal to or less than 10 MW then the QS shall ensure that operating personnel are on duty at least eight (8) hours per <br />day from 8 AM GST to 5 PM GST from Mondayto Friday, with an operator on call at all other hours. <br />8.4.5 FPI, shall at all times be excused from its obligation to purchase and receive energy and capacity hereunder, and FPI. shall <br />have the ability to require the QS to curtail or reduce deliveries of energy, to the extent necessary (a) to maintain the reliability and integrity <br />of any part of FPL's system, (b) in the event that FPL detemtines that a failure to do so is likely to endanger life or property, or (c) is likely to <br />result in significant disruption ofelectric service to FPL's customers. FPL shall give the QS prior notice, if practicable, ofits intent to refuse, <br />curtail or reduce FPI, s acceptance of energy and firm capacity pursuant to this Section and will act to minimize the frequency and duration <br />of such occurrences. <br />(Continued our Shat No. 9.036) <br />Issued by: S. E. Romig, Director, Rates and Tariffs <br />Effective: September 13, 2016 <br />4.►3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.