My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/06/2018
CBCC
>
Meetings
>
2010's
>
2018
>
03/06/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:51:18 PM
Creation date
5/1/2018 1:58:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/06/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
526
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2018 -0085 -PAA -EQ <br />DOCKET NO. 20170226 -EQ <br />PAGE 21 <br />First:ReAsed Sheet No. 9.043 <br />FTARIDA PO1VVFR & LIGHT COMPANY Cancels Original Sheet No. 9.043 <br />(C.ontimed from Sheet No. 9.042) <br />16.1 Except as otherwise provided in this Contact, each party shall be excused from performance when its nonperformance was <br />caused, directly or indirectly by an event of Force Majeure. <br />16.2 In the event of any delay cc nonperformance resulting from on event of Force Majeure, the party claiming Force Majeure shall <br />notify the other party in writing within two (2) business days of Ore occurrence of the event of Force Majeure, of the nature, cause, dale of <br />commencement thereof and the anticipated extent of such delay, and shall indicate whether any deadlines or date(s), imposed hereunder may <br />be affected thereby. The suspension of performance shall be of no greater scope and of no greater duration than the cure for the Force <br />Majchuc requires. A party claiming Force Majeure shall net be entitled to any relief therefore unlcas and until conforming notice is provided. <br />The party claiming Force Majeure shall notify the other party of the cessation of the event of Force Majeure or of the conclusion of the <br />affected party's cure for the event of Force Majeure, in either case within two (2) business days. thereof. <br />16.3 The party claiming Force Majeure shall use its best efforts to etre the cause(s) preventirT its performance of this Contract; <br />provided, however, the settlement of strikes, lockouts and other labor disputes shall be entirely within the discretion of the affected party, <br />mrd such party shall not be required to settle such strikes, lockouts or other labor disputes by acceding to demands which such party deems to <br />be unfavorable. <br />16.4 If the QS suffers all occurrence of an event of Force Majeure that reduces the generating capability of the Facility below the <br />Committed Capacity, the QS may, upon notice to FPL, temporarily adjust The Committed Capacity as provided in Sections 16.5 and 16.6. <br />Such adjustment shall be effective the first calendar day irmncthatcly following FPL's receipt of the notice or such later date as may be <br />specified by the QS. Funtherhom, such adjustment shall be the mininmtm amount necessitated by the event of Force Majeure, <br />16.5 If the Facility is rendered compic1cly inoperative as a result of Force Majeure, file QS shall temporarily set the Committed <br />Capacity equal to 0 KW until such time as the Facility can partially or filly operate at the Committed Capacity that existedprior to the Force <br />Majeure. if the Committed Capacity is 0 KIN, FPL shall have no obligation to make capacity payments hereunder. <br />16.6 M at any time during the occurrence of an event of Force Majeure or during its cure, the Facility can partially or frilly operate, <br />then the QS shall temporarily set the Committed Capacity at the maximuom capability that the Facility can reasonably be expected to operate. <br />16.7 Upon the cessation of the event of Force Majeure or the conclusion of the clue for the event of Force Majeure, the Committed <br />Capacity shall be restored to the Cormnitted Capacity that existed immediately prior to Ute Force Majeure. Notwithstanding airy other <br />provision of this Contract, upon such cessation or cure, FPL shall have the right to require a Corrn9lled Capacity Test to demonstrate the <br />Facility's compliance with the requirements of This section 16.7. Any Contmillod Capacity'rest required by FPL under this Section shalt be <br />additional to any Committed CapacityTcst under Section 5.3. <br />16.9 During the occurrence of an event of Force Majeurc and a reduction in Committed Capacity under Section 16.4, all Monthly <br />Capacity Payments shall reflect, pro rata, the reduction in Committed Capacity, and the Monthly Capacity Payments will continue to be <br />calculated in accordance with the lay-for-porfotmance provisions in Appendix B. <br />16.9 The QS agrees to be responsible for and pay the costs necessary to reactivate the Facility and/or the interconnection with <br />FPL's system if die same is (are) rendered inoperable due to actions of the QS, its agents, or Force Majeure events affecting the QS, the <br />Facility or the interconnection with FPL. FPL agrees to reactivate, at its ort cast the interconnection with the Facility in circuunstanees <br />where any interruptions to such interconnections are caused by FPL or its agents. <br />17. Representations, Warranties, and Covenants of QS <br />The QS represents and warrants that as ofthe Effective Date and for die tern of thus Contract <br />17.1 Organization, Standing and Qualification <br />The QS is a (corporation, partnership, or other, as applicable) duly organized and validly existing in good <br />standing under the laws of and has all neemsary power and authority to carry on its business as presently conducted, to <br />own or hold under lease its properties and to cider into and perform its obligations under this Contract and all ether related documents- and <br />agreements to which it is or shall be a Party. The QS is only qualified or licensed to do business in the State of Florida and in all other <br />jurisdictions wherein the nature of its business and operations or the character of the properties owned or leased by it makes such <br />qualification or licensing necessary and where the failure to be so qualified or licensed would impair its ability to perform its obligations <br />under this Contract or would result in a material liability to or would have a material adverse effect on FPL. <br />(Continued on Slhec No. 9.044) <br />Imued by- S. E. Romig, Director, Rates and Tariffs <br />Effective. August 18, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.