My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/20/2018
CBCC
>
Meetings
>
2010's
>
2018
>
03/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 1:04:05 PM
Creation date
5/1/2018 2:11:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/20/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
545
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 8, 2018 <br />Revised February 27, 2018 <br />Indian River County <br />Engineering Division <br />1801 27th Street <br />Vero Beach, Florida 32960 <br />BUNKMERGER <br />engineering & testing, inc. <br />A Iy rerracon COMPANY <br />Attention: Mr. William Johnson, P.E.... via e-mail (wjohnson@ircgov.com) <br />Roadway Production Engineer <br />Subject: Materials Testing Services <br />58th Ave Resurfacing/Reclamation from 26th to 49th <br />IRC Project No. 1324 / FM No. 434840-1-58-01 <br />Indian River County, Florida <br />Terracon Proposal No. PHB181012 <br />Dear Mr. Johnson: <br />Dunkelberger Engineering & Testing, Inc., A Terracon Company (Terracon) is providing <br />this proposal for Materials Testing Services for construction activities at the subject <br />project in Indian River County, Florida. As requested, we will perform the field work on <br />a unit rate (per test) basis. As such, a four -test minimum charge per trip to the site will <br />apply; sample pick-up will be performed at an hourly rate. <br />A. PROJECT INFORMATION <br />The subject project is located on 58th Avenue from 26th Street to 49th Street. The project <br />will involve full -depth reclamation (FDR) of the existing roadway, i.e., pulverization of the <br />existing asphaltic concrete and base course, shoulder widening utilizing the reclaimed <br />material, shoulder widening using traditional stabilization materials, and <br />milling/resurfacing of select areas. The project length is approximately 11,800 lineal feet <br />(2.25 miles). The contract duration is 270 days to substantial completion and 300 days to <br />final completion. <br />More specifically, the reconstruction will involve pulverization of 12 inches of existing <br />roadway, construction of a 9 -inch thick FDR base course, and construction of three <br />inches of asphalt pavement including a 2 -inch structural course and 1 -inch friction course. <br />The shoulder widening will involve construction a 12 -inch thick FDR section ranging from <br />Dunkelberger Engineering & Testing, Inc., A Terracon Co. 645 NW Enterprise Drive, Suite 107 Port St. Lucie, Florida 34986 <br />P [772] 343 9787 F [772] 343 9404 terracon.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.