My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/20/2018
CBCC
>
Meetings
>
2010's
>
2018
>
03/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 1:04:05 PM
Creation date
5/1/2018 2:11:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/20/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
545
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan <br />Sanitary Sewer Sub -Element <br />residents as well as industrial and business establishments anticipated in future years. The <br />remaining capital cost is recouped through monthly charges. <br />As a payment option for extension of the sewer collection system, the county allows a <br />contribution in aid of construction. After the installation of sewage collection facilities by a <br />developer, title to those facilities is transferred to the county. The referenced facilities may be <br />"on-site" or "off-site." These options are discussed below. <br />• On -Site Facilities <br />Each developer is responsible for the design, installation, inspection, and testing of the complete <br />sewage collection system located within the boundaries of the developer's property. <br />• Off-site Facilities <br />The location, size or proposed density or intensity of a development project may make service to <br />the property dependent upon the extension of off-site sewage collection facilities. Off-site <br />facilities are those mains, sewage collection lines, sewage force mains, and/or pumping stations <br />adequate in size to transmit sewage collected on the developer's property to a treatment plant or <br />disposal site. <br />The county's policy is to expand its sewer system in an orderly and economical manner. That <br />expansion schedule, however, does not always coincide with a developer's plans. In cases where <br />the county does not plan to expand its system to serve a project in the timeframe required by a <br />developer, the developer is required to construct or pay the cost of off-site facilities associated <br />with that project when the following conditions exist: <br />such an extension would require an extraordinary expenditure by the county for <br />transmission facilities; and <br />such expenditure would cost more than the county's standard capacity charge. <br />In that event, the county may negotiate an agreement which enumerates the following: <br />the county's responsibility to provide service to the development and possibly <br />reimburse the developer for oversized facilities; and <br />the developer's responsibility to construct and dedicate to the county the off-site <br />facilities (possibly oversized to meet future demands). <br />Community Development Department <br />Indian River County 17 <br />Attae4ent 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.