Laserfiche WebLink
Comprehensive Plan <br />Sanitary Sewer Sub -Element <br />that using the historic growth of existing facilities in conjunction with population projections is <br />the most accurate method of projecting wastewater generation rates for future treatment facility <br />expansions. <br />Capital Improvements <br />According to the county sanitary sewer master plan, the total design capacity of the county <br />sanitary sewer system in 2030 is projected to be 19 million gallons per day (MGD), while total <br />demand is projected to be about 12.62 million gallons per day (MGD). This information is <br />shown in the graph below. Because all of the plants in the county system are interconnected, <br />there is flexibility as to which plant or plants will be expanded to accommodate future demand. <br />Community Development Department <br />Indian River County 34 <br />260 <br />Attachment 4 <br />