My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/20/2018
CBCC
>
Meetings
>
2010's
>
2018
>
03/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 1:04:05 PM
Creation date
5/1/2018 2:11:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/20/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
545
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br />58th Avenue Res urfacinglReclamation <br />From 26th St to 49th St <br />Indian River County, Florida <br />ESTIMATED SCOPE 8, BUDGET <br />Field Observations 8 Testing <br />vescription <br />Total Units <br />T e <br />I Rate <br />I Extended Cost <br />In -Place Density Testing, FDR (I test/500each ane <br />'4 test minimum per visit <br />100 <br />Test <br />. $24.00 <br />= $2,40000 <br />2 <br />In -Place Density Testing, FDR Shoulder (1 test/2,000 ft) <br />"4 test minimum per visit <br />12 <br />Test <br />. $24.00 <br />- $288.00 <br />3 <br />In -Place Density Testing, Stab. Should (1 test/2,000 ft) <br />'4 test minimum per visit <br />1 12 <br />1 Test <br />. $24.00 <br />= $288.00 <br />4 <br />In -Place Density Testing, Pipe Backfill (1 test/6-in lift per <br />section placed) <br />'4 test minimum per visit <br />45 <br />Test <br />. $25.00 <br />= $1 125.00 <br />s <br />Sr. Eng. Technician, Sampling (18 trips @ 4 hrs/trip) <br />72 <br />Hours <br />.L $60.00 <br />= $4,320.00 <br />Sub -Total <br />$8,421.00 <br />Laboratory <br />Testing <br />Description <br />Total Units <br />Type <br />Rate <br />Extended Cost <br />Proctor Test, FDR (T-180)' <br />1/1,000 ft of each lane <br />24 <br />Each <br />$90.00 <br />= $2,160.00 <br />2 <br />Proctor Test, Embankment/Pipe Backfill (T-99) <br />(1/SoilType) <br />2 <br />Each <br />. $90.00 <br />- $180.00 <br />3 <br />Urnerock Bearing Ratio Test (FM 5-515) <br />1/4,000 ft of Shoulder <br />6 <br />Each <br />. $300.00 <br />= $1,8 0.00 <br />Material Finer than the No. 200 Sieve <br />30 <br />Each <br />. $40.00 <br />= $1,200.00 <br />a <br />Sieve Analysis -27 <br />30 <br />Each <br />. $70.00 <br />= $2,100.00 <br />`The Proctor test for the FDR involves laboratory density determination of the field -prepared FDR mixture with <br />emulsions <br />Sub -Total <br />$7,440.00 <br />Asphalt Observations & esttng <br />Description <br />Total Units <br />I Type <br />Rate <br />Extended Cost <br />, FDOT CTQP Certified Plant Inspector 12 days) <br />120 <br />Hour <br />x $60.00 = $7,200.00 <br />2 Trip Charge to Asphalt Plant from Office <br />12 <br />Tri <br />. $35.00 <br />3 <br />4 <br />Sub -Total <br />$7,620.00 <br />Engineering & Reporting Services <br />escron <br />Total Units <br />Type <br />Rate <br />Extended Cost <br />Principal Engineer <br />15 <br />Hour <br />. $175.00 = $2,625.00 <br />2 Project Mana er/En ineer <br />30 <br />Hour <br />. $95.00 <br />3 Clerical/Adminstration <br />0 <br />Hour <br />x $50.00 = $0.00 <br />4 <br />Sub -Total <br />$5,475.00 <br />Field Observations & Material Testing bervices <br />Subtotal of Materials Testing Services <br />Total <br />$28,956.00 <br />2 <br />. <br />- $0.00 <br />Total <br />$0.00 <br />I Total <br />645 NW Enterprise Drive, Suite 107 - Port St. Lucie, Florida 34986 - p 772.343.9897 - f 772.343.9404 <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.