My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/20/2018
CBCC
>
Meetings
>
2010's
>
2018
>
03/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 1:04:05 PM
Creation date
5/1/2018 2:11:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/20/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
545
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan <br />Sanitary Sewer Sub -Element <br />TABLE 3.A.8 - WATER & WASTEWATER CONNECTION MATRIX FOR NEW <br />DEVELOPMENT <br />* Daily flow refers to water consumption or sewer generation. <br />**The applicant for any development project, where such project will not connect to a <br />centralized system, must sign a developer's agreement with the Indian River County Utilities <br />Department to operate on a private system with a commitment to connect to the regional system <br />when service is available. These agreements shall be conditioned upon demonstration of <br />compliance with applicable federal, state, and local permit requirements. When using a private <br />system or on-site facilities, the developer must construct a dry line or wet line at the time of <br />construction, if required by the Utilities Department. The final determination for the .type of <br />Community Development Department <br />280 <br />Indian River County 54 <br />A A <br />Inside of the Urban Service Area <br />Connect <br />Not Connect <br />Single Family: <br />Within 200' of system <br />X <br />Outside of 200' of system <br />X** <br />Residential Projects: <br />Subdivision, multi -family, site plan, PD, DRI <br />Within'/ mile of the system <br />25 units or more <br />X <br />Less than 25 units <br />X <br />Outside of'/ mile of system <br />25 units or more <br />X <br />Less than 25 units <br />X** <br />Non -Residential Projects: <br />Subdivision, site plan, PD, DRI <br />Within '/ mile of system <br />2,000 gallons daily flow or more* <br />X <br />Less than 2,000 gallons daily flow* <br />X <br />Outside of % mile of system <br />2,000 gallons daily flow or more* <br />X <br />Less than 2,000 gallons daily flow* <br />X** <br />* Daily flow refers to water consumption or sewer generation. <br />**The applicant for any development project, where such project will not connect to a <br />centralized system, must sign a developer's agreement with the Indian River County Utilities <br />Department to operate on a private system with a commitment to connect to the regional system <br />when service is available. These agreements shall be conditioned upon demonstration of <br />compliance with applicable federal, state, and local permit requirements. When using a private <br />system or on-site facilities, the developer must construct a dry line or wet line at the time of <br />construction, if required by the Utilities Department. The final determination for the .type of <br />Community Development Department <br />280 <br />Indian River County 54 <br />A A <br />
The URL can be used to link to this page
Your browser does not support the video tag.