My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/10/2018
CBCC
>
Meetings
>
2010's
>
2018
>
04/10/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:19:35 PM
Creation date
5/2/2018 1:31:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/10/2018
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
within this scope is consistent with CONSULTANT's standards, SWDD's requirements, and FDEPs <br />permit requirements. <br />Task 2.0 is amended to include the specific activities identified below: <br />Subtask 2.4 Construction Quality Management - CONSULTANT's project manager will manage <br />the independent review of CONSULTANT's deliverables, monthly project status <br />reviews, and project close-out activities. CONSULTANT will meet with SWDD staff <br />for project planning and coordination, as needed. CONSULTANT will perform quality <br />technical reviews on the construction phase CONSULTANT deliverables such as <br />record drawings and the Florida Department of Environmental Protection <br />Certifications of Construction Completion. Preparation of invoices and project <br />administration will also be performed under this task. <br />TASK 7.0 - GENERAL ENGINEERING SERVICES DURING CONSTRUCTION <br />These services shall include the following subtasks: <br />Subtask 7.1 After issuance of a Notice of Award by SWDD, CONSULTANT will prepare for and <br />attend a preconstruction meeting with the Contractor. <br />Subtask 7.2 CONSULTANT will consult with and advise SWDD and act as its representative as <br />provided in the General Conditions of the construction contract. Consult with and <br />advise SWDD as to the acceptability of substitute materials and equipment <br />proposed by the Contractor when substitution is permitted by the Contract <br />Documents. <br />Subtask 7.3 CONSULTANT will maintain an on-site presence to observe the progress and quality <br />of the executed work of the Contractor and to determine in general if such work is <br />proceeding in accordance with the Contract Documents. This presence and on-site <br />observations, CONSULTANT shall keep SWDD informed of the progress of the work <br />and shall endeavor to determine in general if such work is proceeding in accordance <br />with the Contract Documents. Additionally, during such visits and on the basis of <br />such observations, CONSULTANT shall disapprove or reject Contractor's work while <br />it is in progress if CONSULTANT believes that such work will not produce a <br />completed Project that conforms generally to the Contract Documents or that it will <br />prejudice the integrity of the design concept of the completed Project as a <br />functioning whole as indicated in the Contract Documents. <br />Subtask 7.4 CONSULTANT will review and approve shop drawings (estimated at 60) and <br />samples, the results of laboratory tests and other data, which the contractor is <br />required to submit by the contract documents. The CONSULTANT will inspect <br />deliveries of the materials to confirm compliance with the shop drawings and the <br />project specifications. <br />Subtask 7.S CONSULTANT will issue instructions to the Contractor and issue necessary <br />interpretations and clarifications of the Contract Documents. CONSULTANT will <br />respond to requests for information (estimated at 10). Act as SWDD's <br />representative to require special inspection or testing of the work. Act as initial <br />CDM Smith A-2 jj2203_Exhibi[ A.docx <br />91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.