My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/10/2018
CBCC
>
Meetings
>
2010's
>
2018
>
04/10/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:19:35 PM
Creation date
5/2/2018 1:31:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/10/2018
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CD <br />Smith <br />Mr. Himanshu Mehta, P.E. <br />March 1, 2018 <br />Page 2 <br />pump station. The work includes duplex pumps, concrete wetwell, concrete slab and <br />driveway, valves, and piping. <br />■ Water Main Extension and Hydrant - The work includes all pipes, valves, fitting, hydrant, and <br />ancillary components for the water main extension. Work also includes a water line to the <br />LCS pump station and hose bib. <br />■ Electrical and Instrumentation - The work includes all components required for electrical <br />and instrumentation to the LCS and LDS pump stations and electrical connections for the air <br />compressors including control panels, grounding, service and distribution, concrete encased <br />ductbank, site lighting, handholes, conduits, disconnects and connections, circuits, and <br />ancillary components. Also included is a 20 -kW diesel genset for the LCS pump station. <br />■ Segment 2 Partial Closure - The work for the Segment 2 Partial Closure includes the <br />construction of a closure cap liner system, stormwater collection, landfill gas system <br />expansion and improvements, and associated site improvements. The proposed Segment 2 <br />partial closure system is comprised of 6 inches of cap foundation layer, a gas venting <br />geocomposite, 40 -mil linear low-density polyethylene (LLDPE) liner, stormwater <br />geocomposite, 18 inches of protective soil, 6 inches of topsoil, and sod. All existing <br />downcomers will be replaced and upsized to 24 -inch corrugated HDPE pipe to be capable of <br />handling the stormwater flows. The landfill gas system will be expanded in the closure area <br />and will include additional vertical collection wells, horizontal collectors, new headers, new <br />air and force main piping, and new well dewatering pumps. <br />■ Segment 2 Access Road Extension and Improvements - The work includes a new landfill <br />access road on top of the new Segment 2 Partial Closure area which will connect to the <br />existing access road on the Segment 2 north sideslope. The work also includes resurfacing of <br />the existing access road along the entire north sideslope of Segment 2. <br />• Air Compressor System - The work includes a turn -key air compressor system and metal <br />building to be installed on the existing flare slab. The system will include air compressors, air <br />dryers, and all required piping and components. <br />DERIVATION OF OPINION OF THE PROBABLE COST OF CONSTRUCTION <br />The prices for each item in this OPCC were prepared by CDM Smith. The material prices were <br />obtained from recognized suppliers, wherever possible, and/or review of recent bids, and such <br />prices reflect delivery to the project site. CDM Smith has reviewed recent bids within the last <br />two years for St. Lucie County and Pinellas County for landfill expansions and closures and find <br />that the OPCC is comparable to these bid prices. <br />65 <br />82193 door <br />
The URL can be used to link to this page
Your browser does not support the video tag.