My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/10/2018
CBCC
>
Meetings
>
2010's
>
2018
>
04/10/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:19:35 PM
Creation date
5/2/2018 1:31:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/10/2018
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ro" <br />DMmith <br />Mr. Himanshu H. Mehta, P.E. <br />March 26, 2018 <br />Page 2 <br />lt`k�rMGM <br />Thalle Construction <br />$16,196,200.00 <br />$ 0.00 <br />0.00% <br />Company, Inc. <br />West Construction <br />$17,295,406.85 <br />$1,099,206.85 <br />6.79% <br />Inc. <br />Southeast <br />Environmental <br />$18,543,800.00 <br />$2,347,600.00 <br />14.49% <br />Contracting, Inc. <br />The low bidder on the project is Thalle with a Grand Total Base Bid of $16,196,200.00. However, <br />Thalle calculated the 10 percent contingency as 10 percent of the total bid, not as an additional 10 <br />percent of the Base Bid Items 1-6. Therefore, if the contingency amount is calculated using this <br />method, the contingency amount would be reduced to $1,457,660.00 and the Grand Total Bid Item <br />Numbers 1-7 would be $16,034,260.00, a reduction the amount of the contingency of $161,940.00. <br />This minor error does not impact the other bidders and makes Thalle's bid even lower than <br />presented. <br />Thalle submitted the following information as required by the Bid Documents: <br />■ Bid Form (00300) -As amended in Addendum No. 2. <br />■ Schedule of Subcontractors (00431) <br />■ State Certification (State Certified General Contractor) <br />■ Power of Attorney (for Surety Bond) <br />■ Schedule of Suppliers (Section 00450) <br />■ Disclosure of Relationships (Section 0452) <br />■ Confirmation of Drug -Free Workplace (Section 00454) <br />• Non -Collusive Affidavit (Section 00455) <br />• General Information Required of Bidders (Section 00456) <br />■ Alternate Suppliers (Section 00460) <br />■ Trench Safety Act Certificate (Section 00480) <br />■ Certificate of Liability Insurance <br />■ Bid Bond for 5 percent of amount bid (Document A310 - 2010) <br />71 <br />82208.doc. iI <br />
The URL can be used to link to this page
Your browser does not support the video tag.