Laserfiche WebLink
INDIAN RIVER COUNTY <br />SOLID WASTE DISPOSAL DISTRICT <br />BOARD MEMORANDUM <br />15, B.D <br />Date: April 2, 2018 <br />To: Jason E. Brown, County Administrator <br />From: Vincent Burke, Director of Utility Services <br />Prepared By: Himanshu H. Mehta, P.E., Managing Director, Solid Waste Disposal District <br />Subject: Indian River County Landfill Amendment No. 2 to Work Order No. 1 to CDM Smith, <br />Inc. <br />DESCRIPTIONS AND CONDITIONS: <br />On July 18, 2017, the Solid Waste Disposal District (SWDD) Board approved the Indian River County (IRC) <br />Landfill contract agreement with CDM Smith, Inc. (CDM Smith), in accordance with FS 287.055, Consultant's <br />Competitive Negotiation Act per the Request for Qualification #2017048 for Engineering Consulting Services for <br />Landfill Closure, Landfill Gas System Expansion, and Cell Construction. <br />Staff requested a proposal from CDM Smith to provide professional engineering services for the proposed Class <br />I Landfill, Segment 3, Cell 2 expansion; the partial closure of Segment 2; and expansion of the landfill gas <br />collection system (Project). The proposed new cell is Cell 2 of Segment 3 (approximately 10.6 acres in size), <br />which will be located immediately to the east of the existing Segment 3, Cell 1. The proposed partial closure of <br />Segment 2 (approximately 25 acres in size) includes closure of the Segment 1, infill vertical expansion area and <br />the final elevations of Segment 2. Expansion of the landfill gas system within Segment 2 is proposed to be <br />constructed concurrently with the partial closure of Segment 2 so that the final components can be installed <br />prior to the closure cap being constructed. Staff has also requested an evaluation of an alternative cover design <br />as well as preliminary planning for a new lift station. <br />This project will be completed in multiple engineering phases. Phase I includes evaluation of available <br />information and developing sufficient information to update/revise existing permit design drawings and <br />complete the final design and specifications that will be used for procurement. On July 18, 2017, the SWDD <br />Board approved the IRC Landfill Work Order No. 1 to CDM Smith in the amount of $131,820 for this initial <br />phase. Phase II Engineering Services include the preparation of the final design and bid package, <br />permitting/regulatory agency support, opinion of probable construction cost, and bidding assistance. On <br />October 3, 2017, the SWDD Board approved IRC Landfill Amendment No. 1 to Work Order No. 1 to CDM Smith <br />in the amount of $558,679, increasing the overall total cost for Work Order No.1 to $690,499. <br />On March 1, 2018, the IRC Purchasing Division received three bids for the Segment 3 Cell 2 Expansion, Segment <br />2 Partial Closure and the Landfill Gas System Expansion for Bid No. 2018025. Per review by staff and CDM <br />Smith, a separate agenda item is being presented to the SWDD Board for the award of the bid to Thalle <br />Construction Company, Inc. in the amount of the base bid of $14,576,600, with a 10% contingency of <br />$1,457,660, for a grand total of $16,034,260. <br />Staff has received a proposal from CDM Smith for Phase III of the work, which includes Engineering Services <br />during Construction. <br />@BCL@140E594C.doc Page 1 85 <br />