Laserfiche WebLink
�— <br />EXHIBIT _B_-_ FEE SCHEDULE <br />PROJECT: Roseland Elevated Storage <br />and Repump Facility { <br />I I <br />{ <br />i SHEET <br />l OF <br />I <br />CLIENT: Indian RiverCounty Utilities <br />j j <br />j { <br />{FILE NO.i <br />I <br />ESTIMATOR: MDM <br />{ I <br />{ { <br />{DATE: 12/15/16 <br />j <br />DESCRIPTION: _ <br />{ <br />DIRECT LABOR <br />( MAN-HOURS) I <br />jAmendment <br />REG _ <br />�CLK <br />DirEp_ <br />LINE <br />T <br />SEN PROF <br />DES/_ <br />EXP <br />PRINC <br />PROF MT/FH P2(TS/NB) <br />SUB <br />_TOTAL_ <br />T <br />NO. TASK <br />___Ll <br />1 ELECTRICAL BUILDING <br />Evaluate cost differences <br />2 <br />8 <br />2 <br />$68 <br />$1,550 <br />Coordinate with vendors <br />2 <br />8 <br />2 <br />$68 <br />$1,550 <br />Update drawings & specs <br />2 8 <br />16 <br />8 <br />$189 <br />$4,287 <br />SUB - C&W <br />3,500 <br />$0 <br />$3,500 <br />2 WATERMAINDESIGN <br />Design altemate route 2 dw s) <br />1 <br />2 81 <br />24 <br />6 <br />$218 <br />$4,964 <br />Coordinate with Fire Dept Svcs & IRCU <br />2 <br />8 <br />6 <br />$86 <br />$1,952 <br />Update OPC <br />2 8 <br />2 <br />2 <br />$94 <br />$2,146 <br />SUB - Zentz <br />4 <br />4 2,500 <br />$37 <br />$3,341 <br />3 ISCADA <br />Coordination with CSD <br />4 <br />10 <br />2 <br />$99 <br />$2,241 <br />CSD <br />1 <br />1 <br />37,440 <br />$0 <br />$37,440 <br />TOTALHOURSI <br />ol <br />161 241 <br />801 <br />32 $43,440 <br />$859 <br />$62,971 <br />LABOR $/HOUR)I <br />2351 <br />2251 1501 <br />1051 <br />96 <br />$0 <br />$0 <br />SUBTOTALI <br />01 <br />36001 36001 <br />84001 <br />3072 0 <br />$18,672 <br />$0 <br />