My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-081
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 1:56:19 PM
Creation date
5/3/2018 2:55:49 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/01/2018
Control Number
2018-081
Agenda Item Number
8.R.
Entity Name
REI Engineers
Subject
Roof Replacement at Indian River Waste Water Treatment Plant
Work Order 6
Area
8405 8th Street, Vero Beach
Project Number
1803
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REI Proposal No. P18TPA-005 Revision 1 <br />April 13, 2018 <br />Page 3 <br />III. PROPOSED SCOPE OF WORK <br />A. Remove existing roof systems down to the existing structural deck and provide new roof <br />system along with sheet metal flashing and accessories to provide a complete, watertight, <br />warrantable roof assembly. <br />IV. OPINION OF PROBABLE CONSTRUCTION COSVENGINEERING FEES <br />A. Based on the anticipated scope of work for this project, the proposed engineering fees are: <br />Engineering Fees: <br />ContractDocuments..................................................................................... $3,960 <br />BiddingPhase............................................................................................... $1,280 <br />Construction Administration......................................................................... $5.710 <br />Total............................................................................................................ $10,950 <br />V. PROJECT SCHEDULE <br />A. Preliminary Contract Documents shall be completed within thirty (30) days of Notice to <br />Proceed. Final Contract Documents shall be completed and sealed within ten (10) days of <br />receipt of comments. <br />B. Construction Administration shall be performed during the estimated construction duration <br />and the project closeout process. This work is expected to take fourteen (14) days calendar <br />days. <br />If this proposal meets with your approval, please notify us in writing. This proposal will remain firm for a <br />period of thirty (30) days. After that time, we reserve the right to review scheduled commitments and <br />prices. <br />If you have any questions regarding this matter, please do not hesitate to call. <br />Respectfully submitted, <br />REI Engineers <br />o r <br />Mark Renninger, PE, RRC, RRO <br />Branch Manager <br />t6 <br />Fei s <br />ENCINE: R5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.