Laserfiche WebLink
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-010-00 <br />STATE -FUNDED GRANT AGREEMENT PROGRAM MANAGEMENT <br />09/17 <br />Page 7 of 1 <br />EXHIBIT "A" <br />PROJECT DESCRIPTION AND RESPONSIBILITIES <br />FPN: 436416-1-54-01 <br />This exhibit forms an integral part of the State -Funded Grant Agreement between the State of Florida, Department of <br />Transportation and <br />INDIAN RIVER COUNTY (the Recipient) <br />PROJECT LOCATION: <br />❑ The project is on the National Highway System. <br />❑ The project is on the State Highway System. <br />PROJECT LENGTH AND MILE POST LIMITS: 3.5 MILES: 58TH Avenue/CR-613 from 57th Street to 85th Street/CR-510 <br />PROJECT DESCRIPTION: This Project will consist of the rehabilitation 3.5 miles of the existing pavement section on 58th <br />Avenue from 571h Street to 851h Street/CR-510 utilizing full depth reclamation technique. The intersection fo 69th Street will <br />be upgraded to provide left -turn movement in all directions. The 69th Street intersection upgrade will include full depth <br />reclamation pavement technique, milling of existing pavement and a full signalized intersection. The newly reconstructed <br />roadways will provide two-lane travel, with 5 -foot bike lane and stabilized shoulders. The pavement design will follow the <br />DEPARTMENT'S flexible pavement design and will include structural course and friction course. Other improvements <br />include, utility relocations and installation of pavement markings. <br />SPECIAL CONSIDERATIONS BY RECIPIENT: <br />The Recipient shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br />accordance with the following schedule: <br />a) Construction to be completed by JUNE 30, 2020. <br />If this schedule cannot be met, the Recipient will notify the Department in writing with a revised schedule or the project is <br />subject to the withdrawal of funding. <br />SPECIAL CONSIDERATIONS BY DEPARTMENT: <br />