My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-083
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 1:59:35 PM
Creation date
5/9/2018 1:54:09 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/08/2018
Control Number
2018-083
Agenda Item Number
8.B.
Entity Name
Florida Department of Transportation
Subject
Grant Agreement
Small County Outreach Program
Area
58th Avenue County Road 613
Alternate Name
Road Reclamation Resurfacing
Document Relationships
2018-048
(Agenda)
Path:
\Resolutions\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-010-00 <br />STATE -FUNDED GRANT AGREEMENT PROGRAM MANAGEMENT <br />09/17 <br />Page 7 of 1 <br />EXHIBIT "A" <br />PROJECT DESCRIPTION AND RESPONSIBILITIES <br />FPN: 436416-1-54-01 <br />This exhibit forms an integral part of the State -Funded Grant Agreement between the State of Florida, Department of <br />Transportation and <br />INDIAN RIVER COUNTY (the Recipient) <br />PROJECT LOCATION: <br />❑ The project is on the National Highway System. <br />❑ The project is on the State Highway System. <br />PROJECT LENGTH AND MILE POST LIMITS: 3.5 MILES: 58TH Avenue/CR-613 from 57th Street to 85th Street/CR-510 <br />PROJECT DESCRIPTION: This Project will consist of the rehabilitation 3.5 miles of the existing pavement section on 58th <br />Avenue from 571h Street to 851h Street/CR-510 utilizing full depth reclamation technique. The intersection fo 69th Street will <br />be upgraded to provide left -turn movement in all directions. The 69th Street intersection upgrade will include full depth <br />reclamation pavement technique, milling of existing pavement and a full signalized intersection. The newly reconstructed <br />roadways will provide two-lane travel, with 5 -foot bike lane and stabilized shoulders. The pavement design will follow the <br />DEPARTMENT'S flexible pavement design and will include structural course and friction course. Other improvements <br />include, utility relocations and installation of pavement markings. <br />SPECIAL CONSIDERATIONS BY RECIPIENT: <br />The Recipient shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br />accordance with the following schedule: <br />a) Construction to be completed by JUNE 30, 2020. <br />If this schedule cannot be met, the Recipient will notify the Department in writing with a revised schedule or the project is <br />subject to the withdrawal of funding. <br />SPECIAL CONSIDERATIONS BY DEPARTMENT: <br />
The URL can be used to link to this page
Your browser does not support the video tag.