My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-083
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 1:59:35 PM
Creation date
5/9/2018 1:54:09 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/08/2018
Control Number
2018-083
Agenda Item Number
8.B.
Entity Name
Florida Department of Transportation
Subject
Grant Agreement
Small County Outreach Program
Area
58th Avenue County Road 613
Alternate Name
Road Reclamation Resurfacing
Document Relationships
2018-048
(Agenda)
Path:
\Resolutions\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-010-60 <br />STATE -FUNDED GRANT AGREEMENT PROGRAM MANAGEMENT <br />olne <br />construction contemplated by the Project, including, as applicable, but not limited to, the applicable <br />provisions of the Manual of Uniform Traffic Control Devices (MUTCD) and the AASHTO Policy on <br />Geometric Design of Streets and Highways. All design work for any portion of the Project to be located on <br />Department right-of-way shall conform to all applicable standards of the Department, as provided in Exhibit <br />"F", Terms and Conditions of Construction, which is attached to and incorporated into this Agreement <br />if a portion of the Project will be located on FDOT's right of way. <br />f. The Recipient shall adhere to the Department's Conflict of Interest Procedure (FDOT Topic No. 375-030- <br />006) or Conflict of Interest Procedure for State Funded Grant Programs (FDOT Topic No. 750-000-002). <br />g. The Recipient will provide copies of the final design plans and specifications and final bid documents to the <br />Department's Construction Project Manager prior to commencing construction of the Project. The <br />Department will specify the number of copies required and the required format. <br />The Recipient shall require the Recipient's contractor to post a payment and performance bond in <br />accordance with applicable law. <br />i. The Recipient shall be responsible to ensure that the construction work under this Agreement is performed <br />in accordance with the approved construction documents, and that it will meet all applicable Recipient and <br />Department standards. <br />j. Upon completion of the work authorized by this Agreement, the Recipient shall notify the Department in <br />writing of the completion of construction of the Project; and for all design work that originally required <br />certification by a Professional Engineer, this notification shall contain an Engineers Certification of <br />Compliance, signed and sealed by a Professional Engineer, the form of which is attached hereto and <br />incorporated herein as Exhibit "C", Engineers Certification of Completion. The certification shall state <br />that work has been completed in compliance with the Project construction plans and specifications. If any <br />deviations are found from the approved plans, the certification shall include a list of all deviations along with <br />an explanation that justifies the reason to accept each deviation. <br />k. The Recipient shall provide the Department with as -built plans of any portions of the Project funded through <br />the Agreement prior to final inspection. <br />11. Maintenance Obligations: In the event the Project includes construction then the following provisions are <br />incorporated into this Agreement: <br />a. The Recipient agrees to maintain any portion of the Project not located on the State Highway System <br />constructed under this Agreement for its useful life. If the Recipient constructs any improvement on <br />Department right-of-way, the Recipient <br />❑ shall <br />❑ shall not <br />maintain the improvements located on the Department right-of-way made for their useful life. If the Recipient <br />is required to maintain Project improvements located on the Department right-of-way beyond final <br />acceptance, then Recipient shall, prior to any disbursement of the State funding provided under this <br />Agreement, also execute a Maintenance Memorandum of Agreement in a form that is acceptable to the <br />Department. The Recipient has agreed to the foregoing by resolution, and such resolution is attached and <br />incorporated into this Agreement as Exhibit "E". This provision will survive termination of this Agreement. <br />12. State Single Audit: The administration of resources awarded through the Department to the Recipient by this <br />Agreement may be subject to audits and/or monitoring by the Department. The following requirements do not limit the <br />authority of the Department to conduct or arrange for the conduct of additional audits or evaluations of state financial <br />assistance or limit the authority of any state agency inspector general, the Auditor General, or any other state official. <br />The Recipient shall comply with all audit and audit reporting requirements as specified below. <br />a. In addition to reviews of audits conducted in accordance with Section 215.97, Florida Statutes, monitoring <br />procedures to monitor the Recipient's use of state financial assistance may include but not be limited to on - <br />Page 7 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.