Laserfiche WebLink
Work Order No. 1 <br />Indian River Blvd & Grand <br />Harbor Blvd - Mast Arm <br />EXHIBIT C—TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately six (6) months from the Notice to Proceed (NTP). <br />NTP <br />Initial Submittal (40% Design Drawings) <br />Interim Submittal (80% Design Drawings) <br />Final Submittal (100% Design Drawings) <br />contingent upon BOCC approval <br />2 months following NTP <br />4 months following NTP <br />6 months following NTP <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />Page 6 of 7 <br />