Laserfiche WebLink
WORK ORDER NUMBER 2 <br />43rd Avenue & 261h Street Intersection Improvements <br />Project Number: IRC -1808 <br />This Work Order Number 2 is entered into as of this 8th day of May , 2018, pursuant <br />to that certain Continuing Consulting Engineering Services Agreement for Professional Services <br />entered into as of this 17th day of April, 2018 (collectively referred to as the "Agreement"), by <br />and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") <br />and KIMLEY-HORN AND ASSOCIATES, INC. ("Consultant"). <br />The COUNTY has selected the Consultant to perform the professional services set forth on <br />Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. <br />The professional services will be performed by the Consultant for the fee schedule set forth in <br />Exhibit B (Fee Schedule), attached to this Work Order and made a part hereof by this reference. <br />The Consultant will perform the professional services within the timeframe more particularly <br />set forth in Exhibit C (Time Schedule), attached to this Work Order and made a part hereof by <br />this reference all in accordance with the terms and provisions set forth in the Agreement. <br />Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict <br />with the terms of the Agreement and the terms of the Agreement shall be deemed to be <br />incorporated in each individual Work Order as if fully set forth herein. <br />EXHIBIT A — SCOPE OF WORK <br />43rd Avenue & 26th Street Intersection Improvements <br />The COUNTY desires to expand the 43rd Avenue & 26th Street intersection to <br />accommodate the pending 43rd Avenue widening south of 26th Street to a five -lane urban <br />non -divided section and the future contemplated expansion of 26th Street/ Aviation <br />Boulevard to a four -lane urban divided thoroughfare roadway. The intersection will be <br />expanded to provide for fully developed dedicated left and right turn auxiliary lanes in the <br />remaining three approaches, then transitioning back to existing lane configurations. The <br />intersection improvement will provide for pedestrian and bicycle lane facilities within the <br />limits of the intersection improvement. The scope of work will also include a wayfinding <br />monument sign, a pedestrian crosswalk lighted warning system and independent <br />intersection roadway lighting. <br />A. Supplemental Design Survey: <br />The Consultant shall provide supplemental design survey services necessary to support and <br />facilitate contemplated design and permitting activities associated with this project to <br />reflect changes in field conditions that have occurred since the original Aviation Boulevard <br />Widening Project design survey was completed. This task will consist of the preparation of <br />1IPage <br />