My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-088
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 2:01:26 PM
Creation date
5/10/2018 1:09:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/08/2018
Control Number
2018-088
Agenda Item Number
8.H.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
43rd Ave and 26th Street Intersection Improvements
Work Order No. 2
Project Number
IRC 1808
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 2 <br />43,d Avenue & 261h Street <br />Intersection Improvements <br />2. Plan sheets shall depict existing right-of-way, section lines, property lines, <br />temporary construction easements, and centerline of construction. Horizontal <br />control points with state plane coordinates for all PC's, PT's, curve radius, curve <br />length and horizontal PI's shall be included on the Plan or summarized in an <br />alignment table. <br />3. Signing and Pavement Markings will be included within the Construction <br />Documents. All signing and pavement markings are to be prepared in accordance <br />with the latest design standards and practices (MUTCD), FDOT Standard <br />Specifications, Indexes, and COUNTY standards. <br />4. Plans shall include spot grades adequate to describe any proposed grading. <br />5. Match lines shall not be located within the limits of an intersection. <br />6. If applicable, soil boring information shall be plotted on cross sections with soil <br />classification and high season water table. <br />7. All quantities shall reference FDOT Pay Item Numbers. <br />8. All details shall reference FDOT Index Numbers, where applicable. <br />9. All specifications shall reference the FDOT Specifications for Road and Bridge <br />Construction. Any deviations or special specifications not included in FDOT <br />Specifications will be provided in the Technical Specifications. <br />10. Initial (40% completion), interim (80% completion) and Final Plan (100% <br />completion) Submittal shall include the following: <br />L Three (3) Sets Plans. <br />ii. One (1) Opinion of Probable Construction Cost <br />iii. One (1) CD with drawings in PDF format. <br />The Consultant will be responsible for producing an opinion of probable cost (OPC) <br />estimate and reviewing and updating the OPC when scope changes occur and/or at <br />designated milestones of the project. A Summary of Pay Items sheet shall be prepared <br />with all required Initial (40%), Interim (80%) and Final Plan (100%) submittals. The Final <br />Plans will be provided signed and sealed. The plans will be prepared based upon English <br />units. The design will be conducted in MicroStation and Geopak. The Final Plans will be <br />provided in Autodesk Civil 3D format. <br />Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.