My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-092
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 2:03:25 PM
Creation date
5/14/2018 3:09:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/08/2018
Control Number
2018-092
Agenda Item Number
15.B.5.
Entity Name
Geosyntec Consultants
Subject
Groundwater Monitoring Reporting and Consulting Services
Area
South Gifford Road Landfill, Former
Bid Number
CCNA2018 Work Order 1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />30 April 2018 <br />Page 5 <br />Geosynte& <br />considtants <br />Task 7 — Data Evaluation and Semi -Annual Reporting: Under this task, Geosyntec will perform <br />data evaluation activities and reporting. The reporting includes preparation of one summer 2018 <br />report (simplified format) and one winter 2018 report for submittal to FDEP. <br />The summer 2018 report will be a letter report with attachments, including a monitoring well <br />location map and tables of the field and laboratory results. Data evaluation activities for the <br />summer 2018 report will include database management, screening results against applicable <br />regulatory criteria, and summary data table preparation. This report will be prepared following the <br />June groundwater sampling event. <br />The winter 2018 report will be consistent with the groundwater monitoring reports historically <br />submitted to FDEP for this Site and the data evaluation activities will include database <br />management, screening results against applicable regulatory criteria, GIS figure preparation, time <br />trend analyses, and/or statistical data analyses. The winter 2018 annual report will be supported by <br />attachments containing Chain -of -Custody sheets, field notes and observations, water sampling <br />logs, maps, graphs, analytical results, and any other applicable materials. <br />In addition to the information outlined above (which has been provided historically in groundwater <br />monitoring reports for the Site), this report will include a more rigorous quantitative statistical <br />evaluation of the CVOC results to support the"possible reduction in the quantity and frequency of <br />the sampling activities. As part of the statistical analysis, trend analysis graphs showing temporal <br />concentrations of constituents and a summary of the Mann -Kendall statistics will be included to <br />identify increasing, decreasing, or no trends in groundwater constituent concentrations. Historical <br />data summaries will be included for monitoring wells recommended for removal from the <br />monitoring plan. This report will be prepared following the December groundwater sampling <br />event. <br />The draft summer and winter 2018 reports will be submitted to IRC SWDD for review prior to <br />submittal to FDEP. Each final report will be signed and sealed by a Florida registered professional <br />engineer or geologist. <br />SCHEDULE <br />The semi-annual groundwater monitoring events will be tentatively conducted in June and <br />December 2018 as described herein. Reports will be submitted to FDEP to meet required <br />deadlines. <br />BUDGET ESTIMATE <br />A budget estimate for the scope of work outlined in Tasks 1 through 7 of this proposal is <br />summarized in the following table, and a detailed budget estimate is provided as Attachment A. <br />The budget estimate presented in this proposal is based on Geosyntec's understanding of the <br />FR0766\XR18011 <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.