My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/04/2011 (4)
CBCC
>
Meetings
>
2010's
>
2011
>
01/04/2011 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2018 4:57:14 PM
Creation date
5/18/2018 4:54:36 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/04/2011
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Millstone Landing Phase III <br />On -Site Sidewalks - Located on Lots <br />Perrormance Bond Exhibit <br />August 20, 2007 <br />.UNIT TDTAL <br />Item DESCRIPTION QUANTITY UNIT PRICE TOTAL, TO COMPLETE <br />1 W' Thick Concrete Sidewalk s 13,400 ! ' SF 6.10 is 88,340.00 $ 6B 340.D0 <br />TOTAL CONSTRUCTION COST $ 68,340.00 $ 68,340.00 <br />Total Completed $ - ID% <br />Total Percentage to be Completed 100% <br />Balance to Complete $ 58,340.00 <br />Performance Bond @ 125% of Balance $ $5,425.00 <br />PREPARED BY.MSTELLER4 NOLER, INC. <br />ATG 2 12097 <br />Stephert.E: Mgler, E FL'#33183 . <br />VICE•PRESIE 01f: <br />0 <br />DE�i �I I T A Ci <br />�t <br />Page 1 of T <br />p0ljr,WMjedt5W34ffMmin%Bond Exhibft <br />(phase 3 Maintenance Bond_072608.3ds I lntemal Sidewalk Bond ONLY) Page IDT 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.