Laserfiche WebLink
Millstone Landing Phase III <br />On -Site Sidewalks - Located on Lots <br />Perrormance Bond Exhibit <br />August 20, 2007 <br />.UNIT TDTAL <br />Item DESCRIPTION QUANTITY UNIT PRICE TOTAL, TO COMPLETE <br />1 W' Thick Concrete Sidewalk s 13,400 ! ' SF 6.10 is 88,340.00 $ 6B 340.D0 <br />TOTAL CONSTRUCTION COST $ 68,340.00 $ 68,340.00 <br />Total Completed $ - ID% <br />Total Percentage to be Completed 100% <br />Balance to Complete $ 58,340.00 <br />Performance Bond @ 125% of Balance $ $5,425.00 <br />PREPARED BY.MSTELLER4 NOLER, INC. <br />ATG 2 12097 <br />Stephert.E: Mgler, E FL'#33183 . <br />VICE•PRESIE 01f: <br />0 <br />DE�i �I I T A Ci <br />�t <br />Page 1 of T <br />p0ljr,WMjedt5W34ffMmin%Bond Exhibft <br />(phase 3 Maintenance Bond_072608.3ds I lntemal Sidewalk Bond ONLY) Page IDT 8 <br />