My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-076A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-076A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 1:30:49 PM
Creation date
5/24/2018 10:08:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/01/2018
Control Number
2018-076A
Agenda Item Number
8.E.
Entity Name
Johnson Davis Inc.
Subject
US1 Air Release Valve and 24 inch Forcemain Replacement
Area
10595 US1, Sebastian South of Schumann Drive
Bid Number
2018047
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) and Johnson - <br />Davis, Inc. (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual <br />covenants hereinafter set forth, agree as follows: <br />ARTICLE 1- WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />generally described as follows: <br />The proposed work generally consists of furnishing all labor, materials, tools and equipment required <br />to remove and replace an existing air release valve (ARV), a portion of a 24" diameter force main, and <br />associated appurtenances in Indian River County. The site is located along the west side of US Highway <br />1 approximately 400 feet south of Schumann Drive. The project will consist of the installation of <br />ductile -iron pipe restraints; the installation of wet taps; the installation of a temporary by-pass <br />forcemain; the installation of line stops; the removal and replacement of an existing ARV and related <br />concrete manhole structure; the removal of a segment of ductile iron forcemain and its replacement <br />with a PVC forcemain, and removal of the temporary by-pass forcemain. <br />ARTICLE 2 - THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is <br />generally described as follows: <br />Project Name: <br />Bid Number: <br />Project Address <br />ARTICLE 3 - CONTRACT TIMES <br />3.01 Time of the Essence <br />US 1- Air Release Valve and 24" Forcemain Replacement <br />2018047 <br />10595 US Highway 1, Sebastian, FL 32958 <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for <br />final payment as stated in the specifications are of the essence of the Agreement. <br />3.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be completed and ready for final payment on or before the 90th day after the date <br />when the Contract Times commence to run. <br />3.03 Liquidated Damages <br />Page 1 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.