Laserfiche WebLink
Bid No. 2018045%I11G1502' <br />Technical Specifications <br />Scope <br />The project will consist of the drainage improvements in an area in Gifford bordered by 43'd Street to the north, <br />41st Street to the south, 28' Avenue to the west and'the F.E.C.R.R. (Florida East Coast Rail Road) tracks to the <br />east. Drainage pipe and drainage structures will be added, swales will be re -graded and asphalt restoration will ' <br />be performed. Other work to include earthwork, maintenance of traffic, erosion control and any other incidental <br />work required to complete the project. The project shall conform to the applicable technical specifications of the <br />Florida Department of Transportation Standard Specifications for Road and Bridge Construction, 2015. <br />Construction Drawings <br />Sheet C-1—to C-15 sheets with the title "Gifford Area Stormwater Project" <br />End of Technical Specifications <br />