Laserfiche WebLink
Indian River County Purchasing Division <br />1800 27th Street <br />Vero Beach, FL 32960 <br />Phone (772) 226-1416 <br />ITEMIZED BID SCHEDULE <br />PROJECT NAME: GIFFORD AREA STORMWATER PROJECT <br />IRC PROJECT NOJBID NO.: 150212018045 <br />BIDDER'S NAME: Johnson -Davis Inc. <br />De`s�`c`Qf.1dr-W -1- 3 E., err E : t x . "mss F y, w 5 ;" ;Muant . *1"Wowl liitE <br />ROADWAY IMPROVEMENTS <br />101-1 <br />MOBILIZATION <br />LS' <br />1 <br />7,000 <br />7,000 <br />102-1 <br />MAINTENANCE OF TRAFFIC <br />LS <br />1 <br />7,500 <br />7,500 <br />104-1 <br />ARTIFICIAL COVERINGS! ROLL EROSION CNTL <br />LS <br />1 <br />1,500 <br />1,500 <br />110-1-1 <br />CLEARING & GRUBBING <br />LS <br />1 <br />12,000 <br />12,000 <br />120-1 <br />REGULAR EXCAVATION <br />CY <br />490 <br />17 <br />1 8,330 <br />285-7-11 <br />OPTIONAL BASE,BASE GROUP 11 <br />SY <br />250 <br />20 <br />5,000 <br />334-1-11 <br />SUPERPAVE ASPHALTIC CONC, TRAFFIC A, 1 -1/2" SP <br />12.5 <br />TN <br />25 <br />415 <br />10,375 <br />425-15-21 <br />INLETS, DT BOT, TYPE C, <10' <br />EA <br />13 <br />2,500 <br />32,500 <br />430-174-215 <br />PIPE CULV, 14!'x 23" ERCP <br />LF <br />585 <br />100 <br />58,500 <br />430-982-625 <br />MITERED END SECT, 14" x 23" <br />EA <br />1 <br />1,700 <br />1,700 <br />530-3-4 <br />RIPRAP, RUBBLE, F&I, DITCH LINING <br />TN <br />15 <br />140 <br />2,100 <br />570-1-2 <br />PERFORMANCE TURF, SOD <br />SY <br />3912 <br />5 <br />19,560 <br />700-1-40 <br />SINGLE POST SIGN, INSTALL <br />EA <br />11 <br />250 <br />2,750 <br />700-1-50 <br />SINGLE POST SIGN, RELOCATE <br />EA <br />11 <br />150 <br />1,650 <br />1080-15 <br />UTILITY FIXTURE, ADJUST& MODIFY <br />EA <br />3 <br />300 <br />900 <br />999-1 <br />AS -BUILT DRAWING BY REGISTERED SURVEYOR <br />LS <br />1 <br />10,000 <br />10,000 <br />SUBTOTAL OF IMPROVEMENTS <br />181,365 <br />FORCE ACCOUNT <br />30,000.00 <br />TOTAL PROJECT BID (INCLUDING FORCE ACCOUNT) <br />GIFFORD AREA STORMWATER PROJECT TOTAL <br />211,365.00 <br />TOTAL PROJECT BID AMOUNT (IN WORDS): Two Hundred Eleven Thousand Three Hundred Sixty Five and Zero Cents <br />NOTE: IF THERE IS A DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) <br />AND THE ITEMIZED BID SCHEDULE. THE BID SCHEDULE WILL GOVERN. <br />LS = Lump Sum EA = Each SY = Square Yard TN = Ton <br />CY = Cubic Yards. <br />Page 11 of 37 . <br />