My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-078A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-078A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 1:35:27 PM
Creation date
5/24/2018 10:35:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/01/2018
Control Number
2018-078A
Agenda Item Number
8.J.
Entity Name
Johnson Davis, Inc.
Subject
Award of project for Gifford Area Stormwater project improvements
Area
Gifford between 41st and 43rd Street; 28th Avenue to R.R. Tracks
Project Number
1502
Bid Number
20188045
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' t <br />i <br />Bid No. 2018045/IRC-1502 <br />Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) <br />and Johnson -Davis, Inc. <br />(hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants <br />hereinafter set forth, agree as follows: <br />ARTICLE 1 - WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />generally described as follows: <br />The project will consist of the drainage improvements in an area in Gifford bordered by 43'd Street to <br />the north, 4150 Street to the south, 28th Avenue to the west and the F.E.C.R.R. (Florida East Coast Rail <br />Road) tracks to the east. Drainage pipe and drainage structures will be added, swales will be re- <br />graded and asphalt restoration will be performed. Other work to include earthwork, maintenance of <br />traffic, erosion control and any other incidental work required to complete the project. The project <br />shall conform to the applicable technical specifications of the Florida Department of Transportation <br />Standard Specifications for Road and Bridge Construction, 2015. <br />ARTICLE 2 -THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is <br />generally described as follows: <br />Project Name: <br />Bid Number: <br />Project Number: <br />Project Address: <br />ARTICLE 3 - CONTRACT TIMES <br />3.01 Time of the Essence <br />GIFFORD AREA STORMWATER PROJECT <br />2018045 <br />IRC -1502 <br />43rd Street to the north, 41" Street to the south, 28th Avenue to the <br />west and the F.E.C.R.R. (Florida East Coast Rail Road) tracks to the <br />east.. Vero Beach. Florida 32967 <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for <br />final payment as stated in the specifications are of the essence of the Agreement. <br />3.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be completed and ready for final payment on or before the 90th day after the date <br />when the Contract Times commence to run. <br />3.03 Liquidated Damages <br />Page 24 of 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.