Laserfiche WebLink
' t <br />i <br />Bid No. 2018045/IRC-1502 <br />Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) <br />and Johnson -Davis, Inc. <br />(hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants <br />hereinafter set forth, agree as follows: <br />ARTICLE 1 - WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />generally described as follows: <br />The project will consist of the drainage improvements in an area in Gifford bordered by 43'd Street to <br />the north, 4150 Street to the south, 28th Avenue to the west and the F.E.C.R.R. (Florida East Coast Rail <br />Road) tracks to the east. Drainage pipe and drainage structures will be added, swales will be re- <br />graded and asphalt restoration will be performed. Other work to include earthwork, maintenance of <br />traffic, erosion control and any other incidental work required to complete the project. The project <br />shall conform to the applicable technical specifications of the Florida Department of Transportation <br />Standard Specifications for Road and Bridge Construction, 2015. <br />ARTICLE 2 -THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is <br />generally described as follows: <br />Project Name: <br />Bid Number: <br />Project Number: <br />Project Address: <br />ARTICLE 3 - CONTRACT TIMES <br />3.01 Time of the Essence <br />GIFFORD AREA STORMWATER PROJECT <br />2018045 <br />IRC -1502 <br />43rd Street to the north, 41" Street to the south, 28th Avenue to the <br />west and the F.E.C.R.R. (Florida East Coast Rail Road) tracks to the <br />east.. Vero Beach. Florida 32967 <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for <br />final payment as stated in the specifications are of the essence of the Agreement. <br />3.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be completed and ready for final payment on or before the 90th day after the date <br />when the Contract Times commence to run. <br />3.03 Liquidated Damages <br />Page 24 of 37 <br />