Laserfiche WebLink
G. become aware of the general nature of the work to be performed by OWNER .and others <br />at the Site that relates to the Work as indicated in the Bidding Documents; <br />H. correlate the information known to Bidder, information and observations obtained from <br />visits to the Site, reports and drawings identified in the Bidding Documents, and all additional <br />examinations, investigations, explorations, tests, studies, and data with the Bidding Documents; <br />I. promptly give ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that Bidder discovers in the Bidding Documents and confirm that the written <br />resolution thereof by ENGINEER is acceptable to Bidder; and <br />J. determine that the Bidding Documents are generally sufficient to indicate and convey <br />understanding of all terms and conditions for the performance of the Work. <br />4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that <br />Bidder has complied with every requirement of this Article 4, that without exception the Bid is <br />premised upon performing and furnishing the Work required by.the Bidding Documents and <br />applying any specific means, methods, techniques, sequences, and procedures of construction <br />that may be shown or indicated.or expressly required by the Bidding Documents, that Bidder has <br />given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder <br />has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are <br />acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and <br />convey understanding of all terms and conditions for performing and furnishing the Work. <br />ARTICLE 5 - PRE-BID CONFERENCE <br />5.01 There will be no pre-bid meeting for this project. <br />ARTICLE 6 - SITE AND OTHER AREAS <br />6.01 The Site is identified in the Bidding Documents. All additional lands and access <br />thereto required for temporary construction _facilities, construction equipment, or storage of <br />materials and equipment to be incorporated in the Work are to be obtained and paid for by <br />CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities <br />are to be obtained and paid for by OWNER unless otherwise provided in the Bidding Documents. <br />ARTICLE 7 - INTERPRETATIONS AND ADDENDA <br />7.01 CONE OF SILENCE. Potential bidders and their agents shall not communicate in <br />any way with the Board of County Commissioners, County Administrator or any County staff <br />other than Purchasing personnel in reference or relation to this solicitation. This restriction shall <br />be effective from the time of bid advertisement until the Board of County Commissioners meets <br />to authorize award. Such communication may result in disqualification. <br />7.02 All questions about the meaning or intent of the Bidding Documents are to be <br />submitted to PURCHASING (purchasing(c'D_ircgov.com) in writing. Interpretations or clarifications <br />considered necessary by ENGINEER in response to such questions will be issued by Addenda <br />mailed or delivered to all parties through the Issuing Office as having received the Bidding <br />00200 - Instructions to Bidders REV 04-07 <br />00200-4 <br />f:\Public Works\ENGINEERING DIVISION PROJECTS\1745 (CR510) 85th Street Right Turn Lane Extension at 66th Ave\1-Admin\Bid Documents\Master Contrail <br />Documents\00200 - Instructions to Bidders REV 04-07.doc Rev. 05/01 <br />