My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-078B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-078B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 1:39:34 PM
Creation date
5/24/2018 3:52:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/01/2018
Control Number
2018-078B
Agenda Item Number
8.K.
Entity Name
Mancil's Tractor Service
Subject
Award of bid to extend turn lane at 66th Avenue and CR 510
Area
County Road CR510 / 85th Street at 66th Avenue
Project Number
IRC-1502
Bid Number
2018045
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. the Work is defective, or completed <br />Work has been damaged, requiring <br />correction or replacement; <br />b. the Contract Price has been reduced <br />by Written Amendment or Change Orders; <br />c. OWNER has been required to correct <br />defective Work or complete Work in accor- <br />dance with paragraph 13.09; or <br />ated in paragraph 15.02.A. <br />C. Payment Becomes Due <br />D. Reduction in Payment <br />1. OWNER may refuse to make <br />payment of the full amount recommended by <br />ENGINEER because: <br />a. claims have been made against <br />OWNER on account of CONTRACTOR's <br />performance or furnishing of the Work; <br />b. Liens have been filed in connection <br />with the Work, except where <br />CONTRACTOR has delivered a specific <br />Bond satisfactory to OWNER to secure the <br />satisfaction and discharge of such Liens; <br />c. there are other items entitling OWN- <br />ER to a set-off against the amount <br />recommended; or <br />d. OWNER has actual knowledge of the <br />occurrence of any of the events enumerated <br />in paragraphs 14.02.B.5.a through <br />14.02.B.5.c or paragraph 15.02.A. <br />2. If OWNER refuses to make payment <br />of the full amount recommended by <br />ENGINEER, OWNER must give <br />CONTRACTOR immediate written notice (with <br />a copy to ENGINEER) stating the reasons for <br />such action and promptly pay CONTRACTOR <br />any amount remaining after deduction of the <br />amount so withheld. OWNER shall promptly <br />pay CONTRACTOR the amount so withheld, or <br />any adjustment thereto agreed to by OWNER <br />and CONTRACTOR, when CONTRACTOR <br />corrects to OWNER's satisfaction the reasons <br />for such action. <br />3. If it is subsequently determined that <br />OWNER's refusal of payment was not justified, <br />the amount wrongfully withheld shall be treated <br />as an amount due as determined by paragraph <br />14.02 C.1. <br />14.03 CONTRACTOR's Warranty of Title <br />A. CONTRACTOR warrants and guarantees <br />that title to all Work, materials, and equipment covered <br />by any Application for Payment, whether incorporated <br />in the Project or not, will pass to OWNER no later than <br />the time of payment free and clear of all Liens. <br />14.04 Substantial Completion <br />A. When CONTRACTOR considers the entire <br />Work ready for its intended use CONTRACTOR shall <br />notify OWNER and ENGINEER in writing that the <br />entire Work is substantially complete (except for items <br />specifically listed by CONTRACTOR as incomplete) <br />and request that ENGINEER issue a certificate of <br />Substantial Completion. Promptly thereafter, <br />OWNER, CONTRACTOR, and ENGINEER shall <br />make an inspection of the Work to determine the <br />status of completion. If ENGINEER does not consider <br />the Work substantially complete, ENGINEER will <br />notify CONTRACTOR in writing giving the reasons <br />therefore. if ENGINEER GGnsiders the `mem <br />substantially-Gem;lete, ENGINEER will pFepaFe and <br />de -liver te OWNER a tentative GeFtifiGate of Substantial <br />Gempletoon whir --h shall fix the date of Substantial <br />Gempletion. There shall be te the GeFtifi <br />an tentafive lost ef items to Oe GOMpleted OF GGFre <br />before final payment. OWNER shall have seven days <br />a}akeMvFi#en objeIsion to ENGINEER as to any <br />pFevisions of the GeFtifiGate or attaGhed list. if, <br />that the Werk is net--sabstantially GOMpletee-, <br />ENGINEER will within 44 days after submission of - - <br />tP_nta;t6ye rUP-4ifiGate to OWNER notify CONTRACTOR <br />dF; w ing, staff --the Fealsons therefor. if, after <br />ENGINEER will within said 14 days execute —and <br />delffiveF t0 OWNER and GONTRAGTOP a definitive <br />tentative list of iterns to be GOMpleted OF GeFferted) <br />as ENGINEER believes justified after nen iOeFatien of <br />00700 - General Conditions REV 5-10-13 <br />00700-40 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1745 (CR510) 85th Street Right Tum Lane Extension at 66th Ave\1-Admin\Bid Documents\Master Contract Documents\00700 - <br />General Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.