My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-078B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-078B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 1:39:34 PM
Creation date
5/24/2018 3:52:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/01/2018
Control Number
2018-078B
Agenda Item Number
8.K.
Entity Name
Mancil's Tractor Service
Subject
Award of bid to extend turn lane at 66th Avenue and CR 510
Area
County Road CR510 / 85th Street at 66th Avenue
Project Number
IRC-1502
Bid Number
2018045
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC -11.01 Cost of the Work <br />SC -11.01.A.1. Delete paragraph GC -11.01.A.1 in its entirety, and insert the following sentences <br />in its place: <br />CONTRACTOR will receive payment for actual costs of direct labor and burden <br />(see SC -2.06.B) for the additional or unforeseen work. Labor includes foremen <br />actually engaged in the work; and will not include project supervisory personnel nor <br />necessary on-site clerical staff, except when the additional or unforeseen work is a <br />controlling work item and the performance of such controlling work item actually <br />extends completion of the project due to no fault of the Contractor. Compensation <br />for project supervisory personnel, but in no case higher than a Project Manager's <br />position, shall only be for the pro -rata time such supervisory personnel spent on <br />the contract. In no case shall an officer or director of the Company, nor those <br />persons who own more than 1 % of the Company, be considered as project <br />supervisory personnel, direct labor or foremen hereunder. The expenses of <br />performing Work outside of regular working hours, on Saturday, Sunday, or legal <br />holidays, shall be included in the above to the extent authorized by OWNER. <br />SC -13.03 Test and Inspections <br />SC -13.03. B. Delete paragraph GC -13.03.8 in its entirety, and insert the following sentences in <br />its place: <br />B. OWNER shall employ and pay for the services of an independent testing laboratory to <br />perform all initial inspections, tests, or approvals required by the Contract Documents <br />except those inspections, tests, or approvals listed immediately below. Subsequent <br />inspections, tests, or approvals required after initial failing inspections, tests, or <br />approvals shall be paid for by the CONTRACTOR by back charge to subsequent <br />applications for payment. The CONTRACTOR shall arrange, obtain, and pay for the <br />following inspections, tests, or approvals: <br />1. inspections, tests, or approvals covered by paragraphs 13.03.0 and 13.03.D <br />below; <br />2. costs incurred in connection with tests or inspections conducted pursuant to <br />paragraph 13.04.6 shall be paid as provided in said paragraph 13.04.13; <br />3. tests otherwise specifically provided in the Contract Documents. <br />SC -13.05 OWNER May Stop the Work <br />SC -13.05.A. Delete paragraph GC -13.05.A in its entirety and insert the following paragraph in its <br />place: <br />A. If the Work is defective, or CONTRACTOR fails to supply sufficient skilled <br />workers or suitable materials or equipment, or fails to comply with permit <br />requirements, or fails to comply with the technical specifications, or fails to <br />perform the Work in such a way that the completed Work will conform to the <br />Contract Documents, OWNER may order CONTRACTOR to stop the Work, or any <br />portion thereof, until the cause for such order has been eliminated; however, this <br />right of OWNER to stop the Work shall not give rise to any duty on the part of <br />OWNER to exercise this right for the benefit of CONTRACTOR, any <br />Subcontractor, any Supplier, any other individual or entity, or any surety for, or <br />employee or agent of any of them. <br />00800-7 <br />00800 - Supplementary Conditions 05-13 rev <br />00800 7F:\Public Works\ENGINEERING DNISION PROJECTS\1745 (CR510) 85th Street Right Tum Lane Extension at 66th Ave\1-Admin\Bid DocumentsXMaster Contract <br />Documents\00800 - Supplementary Conditions 05-13 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.