My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/17/2018
CBCC
>
Meetings
>
2010's
>
2018
>
04/17/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:22:45 PM
Creation date
6/1/2018 12:30:24 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/17/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The event brought in 275 cars and recycled 10,106 lbs. of electronics as well as paint cans, propane <br />tanks, pesticides, and other HHW. Our next recycling event will be the Waste Tire Amnesty Day on <br />April 28, 2018 from 9 am to 3 pm at the Main County Landfill and the five CCCs. <br />This year, SWDD launched a Mailer Campaign where 6.5 x 11" postcards were mailed to single family <br />and multifamily homes in IRC. The postcard contained general recycling information as well as <br />explanations to why particular items are not accepted in the blue recycling cart. <br />In conjunction with the recycling mailer, SWDD staff developed a brief survey to collect valuable <br />feedback from the community about the garbage and recycling services available in IRC. To encourage <br />participation, any resident that fills out the survey can choose to enter a raffle for a chance to win a <br />$100 gift card donated by Target Corporation or a $25 gift card donated by Countryside Citrus. As of <br />April 6, 2018, over 300 survey submissions have already been submitted. In early May, SWDD will launch <br />a general recycling advertising campaign and remind residents to fill out the online survey. The drawing <br />for the raffle will take place on June 1, 2018, and SWDD staff will share the results of the survey at the <br />3rd quarterly update to the SWDD Board. <br />@BCL@F40D9COA.docx - Page 4 - 187 <br />
The URL can be used to link to this page
Your browser does not support the video tag.